My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-03-2021 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
05-03-2021 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 10:53:20 AM
Creation date
11/4/2021 9:07:24 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/03/2021
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Lino Lakes, Minnesota P a g e | 32 <br />6. Sample Quarterly Bills <br />The following is a list of sample water bills without the water treatment plant. As above, <br />the bills represent quarterly bills at current rates and proposed 2022 and 2025 quarterly <br />bills assuming the same consumption levels. <br />Sewer rate recommendations and average bills will remain the same as shown above. <br /> <br />WATER SAMPLE BILLS - NO NEW WTP <br />Current 2022 2023 2024 2025 <br />Prison A 1695 1695 1695 1695 1695 consumption <br />3,978.25$ 4,077.46$ 4,179.14$ 4,283.37$ 4,390.21$ <br />Centennial School District B 43 43 43 43 43 consumption <br />626.05$ 628.20$ 630.41$ 632.67$ 634.98$ <br />Lino Lakes Elementary School C 60 60 60 60 60 consumption <br />591.00$ 594.28$ 597.63$ 601.07$ 604.60$ <br />Single Family Residential - 1 D 44 44 44 44 44 consumption <br />99.40$ 101.64$ 103.93$ 106.27$ 108.68$ <br />Single Family Residential - 2 E 93 93 93 93 93 consumption <br />233.56$ 239.15$ 244.88$ 250.75$ 256.77$ <br />Progressive Engineering (IRRGTN)F 110 110 110 110 110 consumption <br />338.30$ 346.76$ 355.43$ 364.31$ 373.42$ <br />Mountain Manufacturing G 24 24 24 24 24 consumption <br />65.72$ 66.86$ 68.03$ 69.24$ 70.47$ <br />Contract Hardware (IRRIGTN)H 114 114 114 114 114 consumption <br />352.90$ 361.72$ 370.77$ 380.03$ 389.54$ <br />Pomps Tire Service I 15 15 15 15 15 consumption <br />88.05$ 88.75$ 89.47$ 90.21$ 90.96$ <br />Hampton Inn & Suites J 413 413 413 413 413 consumption <br />1,535.55$ 1,559.44$ 1,583.92$ 1,609.02$ 1,634.75$
The URL can be used to link to this page
Your browser does not support the video tag.