Laserfiche WebLink
11 <br /> <br />Wetland replacement will occur via wetland bank account #1522, in the amount of 1.5767 <br />acres. The wetland bank is within the same major watershed and BSA of the project site. <br /> <br />Impact/Mitigation Table <br /> <br />Wetland Name Impact Amount Replacement Ratio Required <br />Wetland A 68,685 sf of fill <br />(1.5767 acres) 1:1 68,685 sf <br />(1.5767 acres) <br />Wetland B 1,670 sf NA NA <br />TOTAL 68,685sf <br />(1.5767 acres) 1:1 68,685 sf <br />(1.5767 acres) <br /> <br />The wetlands are not within the Wetland Management Corridor (WMC) so a WMC wetland <br />buffer is not required. <br /> <br />A drainage & utility easement is being dedicated over the stormwater pond and a portion of the <br />wetland. Additional easements will be dedicated in conjunction with future development of the <br />outlots. <br /> <br />Shoreland District <br /> <br />The development is not located in the Shoreland District. <br /> <br />Floodplain <br /> <br />There is no FEMA floodplain on site. <br /> <br />Public Safety Comments <br /> <br />Deputy Director L’Allier notes a hydrant shall be located closer to the Fire Department <br />Connector (FDC) on the north side of the building near the transformer. The hydrant has been <br />relocated and approved by the Deputy Director. <br /> <br />The Police Division reviewed the plans and had no issues that needed to be addressed. <br /> <br />Environmental Board <br /> <br />The Environmental Board reviewed the development proposal at their July 29, 2020 meeting. <br />The Board recommended approval with minor revisions required. <br /> <br />Comprehensive Plan <br />