My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-10-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
05-10-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 10:53:20 AM
Creation date
11/4/2021 9:07:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/10/2021
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />DEVELOPMENT AGREEMENT <br />Otter Crossing <br /> THIS AGREEMENT is made this _____ day of ____________, 2021, by and between the City <br />of Lino Lakes (“City”), a Minnesota municipal corporation, and BLino, LLC (“Developer”). <br />1. Subdivision. Developer received preliminary plat approval from the City by Resolution No. <br />20-98 for a plat known as Otter Crossing (“Subdivision”). Unless otherwise stated, all terms <br />and conditions of this Agreement relate to work within the Subdivision. <br />2. Final Plat Approval. The City’s approval of the final plat of Otter Crossing is contingent <br />upon execution and delivery of this agreement, all required petitions, bonds, security, <br />and other documents required by the City, and satisfaction of all conditions of approval <br />required by Resolution No. 21-41. The Final Plat is attached hereto as Exhibit A. <br /> <br />3. Phased Development. The City may refuse to approve final plats of subsequent additions <br />of the plat if the Developer has breached this Agreement and the breach has not been <br />remedied. Development of subsequent phases may not proceed until Development <br />Agreements for such phases are approved by the City and are fully executed. <br />4. Developer Plans. <br />a. The Subdivision shall be developed in accordance with the following Developer <br />Plans, original copies of which are on file with the City Engineer. The Developer <br />Plans may be prepared and revised after entering into this Agreement but must <br />be approved by the City before commencement of any work. If the plans vary <br />from the written terms of this Agreement, this Agreement shall control. <br />b. The Developer Plans as of the date of this Agreement are: <br />i. Otter Crossing final plat containing 2 sheets, prepared by Pioneer <br />Engineering, received March 11, 2021. <br />ii. Otter Crossing Final Utility & Construction plans containing 17 sheets and <br />L1, prepared by Pioneer Engineering, revised April 4, 2021. <br />5. Permits. The Developer shall be responsible for securing all site grading and <br />development approvals and all other required permits from all appropriate Federal, <br />State, Regional and Local jurisdictions prior to the commencement of site grading or <br />construction and prior to the City awarding construction contracts for public <br />improvements, if any. Notwithstanding the forgoing, site grading will be allowed to <br />proceed concurrently with the traffic signal design and approval process for the Anoka <br />County Highway Department Access Permit.
The URL can be used to link to this page
Your browser does not support the video tag.