My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-10-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
05-10-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 10:53:20 AM
Creation date
11/4/2021 9:07:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/10/2021
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Otter Crossing <br />Development Agreement <br />May 10, 2021 <br /> page 8 <br /> <br />Availability Charge <br /> <br />Commercial/Industrial/Institutional availability charges shall be paid at the time <br />of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES). <br /> <br />City Sewer (CSAC) $1,525.00 Per SAC Unit <br /> <br />Trunk sewer unit charges addressed under this paragraph are in addition to any <br />SAC charges imposed by Metropolitan Council Environmental Services. An <br />estimate of the total charge and the trunk utility credit for developer installed <br />trunk oversizing is specified in Exhibit B. <br />e. Trunk Water Connection Fees <br />The City established trunk utility connection fees to uniformly distribute the <br />costs of public trunk water infrastructure. The Trunk Utility Connection Fee <br />consists of two components; a Trunk Charge and an Availability Charge. <br />Trunk Charge <br /> <br />The trunk charge shall be paid at the time of subdivision approval or at the time of <br />hook-up, whichever is first. Commercial/Industrial/Institutional (CII) trunk charges <br />are based on a factor of 2.92 units per acre. <br /> <br />Water $2,341.00 Per Unit <br /> <br />Availability Charge <br /> <br />Commercial/Industrial/Institutional availability charges shall be paid at the time <br />of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES). <br /> <br />City Water (CWAC) $1,473.00 Per SAC Unit <br /> <br />An estimate of the total charge and the trunk utility credit for developer installed <br />trunk oversizing is specified in Exhibit B. <br />f. Surface Water Management Area Charges
The URL can be used to link to this page
Your browser does not support the video tag.