Laserfiche WebLink
Staff is now proposing to move forward with the water treatment pilot study. This study is the <br />first step to verify the effectiveness of the full scale treatment process. The purpose of the study <br />is to provide the City with critical information that is required to design and size a water <br />treatment plant to address the high manganese and iron levels in its drinking water. If <br />authorized, the study would be completed by the end of the year. The results of the study are <br />typically good for approximately 5 years. After that, the study would need to be redone. <br /> <br />WSB has provided a proposal with a not to exceed cost of $26,400. Funding will be provided <br />from the Trunk Utility Area and Unit Fund. <br /> <br />RECOMMENDATION <br /> <br />Staff is recommending adoption of Resolution No. 21-59 Authorizing Preparation of a Water <br />Treatment Plant Pilot Study. <br /> <br />ATTACHMENTS <br /> <br />1. Resolution No. 21-59 <br />2. Proposal for Water Treatment Plant Pilot Study <br />3. Photo of Trailer and Water Treatment Plant <br /> <br />