My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-09-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
08-09-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:21:36 AM
Creation date
11/4/2021 11:08:49 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/09/2021
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Storm Water Utility Report City of Lino Lakes, MN WSB Project No. 017518-000 Page 8 <br />3) Non-Residential Fee. The non-residential fee is charged per acre of impervious surface to those parcels with Airport, Cemetery, Commercial, Government Facilities, House of Worship, Industrial, Schools, and Utility land uses. Multi-family apartments where the owner pays the utility bills are included in this grouping. 4) Exemptions. Those parcels with Agricultural, City Park and Recreation, County Park and Recreation, Open Space/Conservation, Open Water, Roadway Rights-of-Way, and <br />Vacant land uses are exempt from the storm water utility fee. Parcels of other land uses may be exempt on a case-by-case basis as determined by the City. For example, the Correctional Facility is exempt because it is its own MS4. 5) Credits. If a Best Management Practice (BMP) has been constructed that retains or filters the first inch of runoff from the impervious surfaces on a parcel(s), those parcel(s) are eligible for a 25% credit. A partial credit may be received based on lesser treatment (i.e., <br />retaining or filtering 50% of the first inch of runoff would receive a 12.5% credit). If a parcel has a BMP that was constructed specifically to provide water quality treatment, it is eligible for a credit. A 25% credit is applicable if the BMP was designed to achieve NURP treatment (40-60% Total Phosphorus (TP) and 80-90% Total Suspended Solids (TSS) <br />removal). A partial credit may be received based on lesser treatment (i.e., providing 50% of NURP treatment would receive a 12.5% credit). These credits are available only for <br />non-residential land uses. 6) Establishment. The residential and non-residential storm water utility fee may be set and established for a period of time as decided by City Council resolution. The fee shall be payable quarterly. <br /> 4.2 Resolution Language <br /> The following can be included in a City Council resolution to establish the storm water utility fee. <br />Land Use Base Fee <br />Single Family Residential <br />$12.00/parcel Multi-Family Residential <br />Rural Residential <br />Airport <br />$175/ac impervious <br />Cemetery <br />Commercial <br />Government Facilities <br />House of Worship <br />Industrial <br />Schools <br />Utility <br />Agricultural <br />Exempt <br />City Park and Recreation <br />County Park and Recreation <br />Open Space/Conservation <br />Open Water <br />Roadway Rights-of-Way <br />Vacant <br /> In addition to this table, the City has a GIS file and spreadsheet of the land use designation and <br />impervious coverage for each parcel within the City.
The URL can be used to link to this page
Your browser does not support the video tag.