Laserfiche WebLink
<br />position, warming house attendants ($14,500) and the remainder of the Recreation <br />Department budget ($14,000) would need to be restored for a total of $82,303. <br /> <br />Capital Equipment Replacement <br /> <br />In line with the Capital Equipment Plan reviewed last fall, the City will be moving away <br />from issuing Certificates of Indebtedness for Public Safety/Fleet capital equipment and <br />will instead move toward a Pay-As-You-Go approach. The Capital Equipment <br />Replacement levy provides budget flexibility in that the amount can be adjusted in line <br />with needs and budget circumstances in the current year. <br /> <br />The Plan estimated an initial levy of $321,000, but in order to more slowly implement the <br />Plan, Staff has decreased the levy to $150,000 with an additional $100,000 of funding <br />from General Fund reserves. <br /> <br />Additional detail on Capital Equipment Replacement can be found on pages 78-99 of the <br />2022 Annual Budget document. Please note, the Single Axle Dump Truck is currently not <br />funded. <br /> <br />Street Maintenance <br /> <br />The Street Maintenance Levy has increased $71,111 or 10%. The $782,224 levy will be <br />used in combination with $120,000 from the Water Fund to complete a street <br />preservation project in line with the City’s Pavement Management Plan. <br /> <br />The 2018 Pavement Management Plan recommended increasing preservation funding <br />from 5% to 10% annually. Increased funding will increase the annual project scope and <br />is predicted to improve the overall condition rating of city streets. The City Council <br />increased funding by 5% in 2020 and 7.5% in 2021. A slow decline in the overall <br />condition rating is predicted in future years with an increase of less than 10%. <br /> <br />Storm Water Utility <br /> <br />The draft budget assumes the adoption of a Storm Water Utility (SWU). The budget is <br />shown as the City’s third utility, Fund 603, on pages 117-119. Assumptions from the <br />SWU Feasibility report, prepared by WSB and Associates, were used in the creation of <br />the budget. <br /> <br />With the implementation of the SWU the operating tax levy decreased $294,864 as the <br />costs moved to the Storm Water Utility Fund to be funded by the proposed Storm Water <br />Fee. <br /> <br />Park and Trail Improvements <br /> <br />A levy of $90,000 is requested in line with 2019 and 2020 funding. The Park and Trail <br />Improvement Fund has completed the following projects since 2018: <br /> <br />• Birch Park Playground Improvements ($30,000)