My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-23-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
08-23-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:21:36 AM
Creation date
11/4/2021 11:08:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/23/2021
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6B <br /> <br />STAFF ORIGINATOR: Diane Hankee, PE City Engineer <br /> <br />C. C. MEETING DATE: August 23, 2021 <br /> <br />TOPIC: Consider Resolution 21-87, Order Project, Approve the Plans <br />and Specifications and Authorize the Ad for Bid, CRJ/CSAH <br />49 (Hodgson Road) Trunk Utility Improvements <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting Council approval to authorize the ad for bid for the CRJ/CSAH 49 (Hodgson <br />Road) Trunk Utility Improvements. <br /> <br />BACKGROUND <br /> <br />On March 26, 2018, the City Council approved the preparation of the plans and specifications for <br />the CRJ/CSAH 49 (Hodgson Road) Trunk Utility Improvements. <br /> <br />The proposed improvements include construction of a sanitary sewer lift station and watermain <br />looping in the southwest corner of the City. The City’s water system is in need of strengthening in <br />that part of the City which is mitigated by the water system looping. The lift station is sized to serve <br />approximately 50 acres both east and west of Hodgson Road. Watermain and a sanitary forcemain <br />would be extended from Woodridge Lane to the western edge of the Lyngblomsten project. The <br />Lyngblomsten project will extend these facilities to the north and east. <br /> <br />The project cost including contingencies and overhead is $1.2 million. The project is funded <br />through the trunk area and unit fund. Due to material delays and contractor labor shortages, <br />construction costs are reported to be higher and the project cost estimates have been adjusted. <br />Lift station materials can take up to a year to become available thus awarding a contract this fall <br />will help address the delays. <br /> <br />The estimated schedule for the project: <br /> <br />Order Improvement, Authorize Plans and Specifications March 26, 2018 <br />Approve Plans and Specifications, Authorize Ad for Bids August 23, 2021 <br />City Opens Bids September 22, 2021 <br />City Council Awards Contract September 27, 2021 <br />Construction Begins Fall, 2021 <br />Final Completion September, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.