My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-04-2021 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
10-04-2021 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:21:36 AM
Creation date
11/4/2021 11:09:13 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/04/2021
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. General Provisions_V1 <br /> <br />3-86 <br />(a) Properly fence any pit or excavation, and barricade entrances to prevent the general <br />public from depositing garbage or refuse. <br /> <br />(b) Slope the banks, and otherwise guard and keep any pit or excavation in such condition <br />as not to be dangerous because of sliding or caving banks. <br /> <br />(c) Properly drain, fill, or level off any pit or excavation so as to make the same safe and <br />healthful as the permitting authority may determine. <br /> <br />(d) Limit the depth of such excavation to an elevation no lower than the minimum floor <br />elevation for building construction as established by the City Engineer, so as not to diminish <br />development potential of the parcel. <br /> <br />(e) Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or other like <br />and similar non-decomposable material. Concrete, asphalt, metal, wood, and other debris shall be <br />prohibited. <br /> <br />(f) Require that all decomposable material, or other unsuitable foundation material, be <br />removed from an area before deposition of fill begins. <br /> <br />(g) Prepare a site plan showing existing and proposed grade elevations and effect of <br />storm water drainage on adjacent areas. <br /> <br />(h) Specify a time when the excavation or land reclamation project shall be completed. <br /> <br />(i) Place a minimum of four (4) inches of top soil over the completed project and <br />establish appropriate ground cover within sixty (60) days of completion, or in a time period <br />consistent with the City’s stormwater management and pollution prevention plan. <br /> <br />(j) Reimburse the City for the cost of periodic inspections by the City for the purpose of <br />determining that the terms under which the permit has been issued are being complied with. <br /> <br />(k) Implement the tree preservation plan. <br /> <br />(l) In addition to an interim conditional use permit, the City Engineer may determine <br />that permits in excess of twenty-five thousand (25,000) cubic yards require the applicant to conduct <br />a neighborhood meeting and to notify affected property owners within one-quarter (1/4) mile. <br /> <br />(m) Post a form of security and sum as the permitted authority may require, running to <br />the City, conditioned to pay the City the cost and expense of repairing or cleaning any highways, <br />streets, or other public ways within the City made necessary by the special burden resulting from <br />transporting thereon by the applicant material to or from the site, the amount of such cost to be <br />determined by the Council; and conditioned further to comply with all the requirements of this <br />Ordinance and the particular permit, and to save the City free and harmless from all suits or claims
The URL can be used to link to this page
Your browser does not support the video tag.