My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-04-2021 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
10-04-2021 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:21:36 AM
Creation date
11/4/2021 11:09:13 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/04/2021
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. General Provisions_V1 <br /> <br />3-102 <br />§1007.055 BATCH PLANTS. <br /> <br />(1) Purpose. The purpose of this section is to provide standards for the establishment and <br />use of Batch Plants intended to provide construction materials for a defined project within a limited <br />timeframe. <br /> <br />(2) Application. In order to operate within the city a Batch Plant must be located within the <br />Light Industrial, General Industrial, Rural Business Reserve, Rural Executive or Rural zoning <br />districts, and must obtain an Interim Use Permit per §1007.017. <br /> <br />(3) Requirements. In addition to the General Standards contained within §1007.017, <br />Temporary Batch Plants are also required to comply with the following conditions and <br />performance standards in order to obtain an Interim Use Permit: <br /> <br />(a) The Batch Plant shall be located on the site so as to minimize the disturbance of <br />surrounding dwelling units or commercial businesses. <br /> <br />(b) The Batch Plant shall maintain a 50 foot setback from any wetland. <br /> <br />(c) The project intended to be served by the batch plant and a deadline for removal <br />shall be clearly defined. <br /> <br />(d) The Hours of Operation shall be clearly defined. <br /> <br />(e) Access to and from the site shall be reviewed and approved by the City Engineer <br />prior to any site disturbance. <br /> <br />(f) A grading, erosion and sediment control plan shall be submitted and approved by <br />the City prior to any site disturbance. <br /> <br />(g) A Storm Water Pollution Prevention plan shall be submitted and approved by the <br />City prior to any site disturbance. <br /> <br />(h) A restoration plan shall be submitted and approved by the City prior to any site <br />disturbance. <br /> <br />(i) All applicable Minnesota Pollution Control Agency requirements are satisfactorily <br />met. <br /> <br />(j) All applicable Rice Creek Watershed District requirements are satisfactorily met. <br /> <br />(k) So as to maintain compatibility with the surrounding area and to protect the health, <br />safety and general welfare of the public, the City Council may impose additional limitations, <br />conditions or requirements as it deems necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.