My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-04-2021 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
10-04-2021 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:21:36 AM
Creation date
11/4/2021 11:09:13 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/04/2021
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. General Provisions_V1 <br /> <br />3-14 <br />c. The City is notified of any change of structure ownership, removal or <br />modification. <br /> <br />d. Lease or joint use agreements or arrangements applicable to each utility <br />structure are disclosed. <br /> <br />(f) Completion of Exterior Improvements. <br /> <br />1. All exterior improvements of a structure, or portion thereof, to single family <br />dwellings, multiple family dwellings of twelve (12) units or less, or any structure accessory to a <br />residential use shall be completed in accordance with City-approved construction plans within one <br />hundred eighty (180) days after the date the City issued the building permit. <br /> <br />2. All exterior improvements of a structure, or portion thereof, to multiple family <br />dwellings of more than twelve (12) units or any commercial, industrial, office, institutional or non- <br />residential structure shall be completed in accordance with City-approved construction plans <br />within one (1) year after the date the City issued the building permit. <br /> <br />3. In all cases, the compliance deadline shall be upheld unless: <br /> <br />a. The process for a temporary Certificate of Occupancy is completed as <br />described in the City Fee Schedule, as amended, which would extend the completion date beyond <br />those listed in paragraphs 1. and 2. above; or <br /> <br />b. A written extension is submitted and approved by the Building Official. Such <br />an extension may be granted in the event that a natural disaster or a calamitous event occurs which <br />unavoidably delays the completion of the building project. <br /> <br />4. For building permits issued prior to the effective date of the ordinance amendment <br />establishing the time limits in paragraphs 1. and 2. above (Ordinance No. 01-08), the time period <br />for the limits begins with the effective date of the amendment establishing the time limits. <br /> <br />(3) Height. <br /> <br />(a) Exceptions. The building height limits established herein for districts shall not apply <br />to the following: <br /> <br />1. Farm structures. <br /> <br />2. Church spires not exceeding 60 feet in height. <br /> <br />3. Belfries not exceeding 60 feet in height. <br /> <br />4. Cupolas not exceeding 60 feet in height. <br />
The URL can be used to link to this page
Your browser does not support the video tag.