My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-11-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
10-11-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:21:36 AM
Creation date
11/4/2021 11:09:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/11/2021
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Community Development\Projects\Capital Improvement Projects\2022 77th Street Realignment\Staff <br />Reports\20211011 CC Authorize Plans & Specs\4. 017210-000 Design Fee Proposal.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM October 6, 2021 <br /> <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br />Re: Engineering Proposal for Design, and Bidding of the 77th Street <br />Realignment Project <br /> <br />Dear Mr. Grochala: <br /> <br />The City of Lino Lakes is moving forward with the the 77th Street Realignment Project <br />and would like to start the preparation of the bid documents and signal justification report <br />(SJR). The project includes the removal of the existing portion of 77th Street W between <br />Marilyn Drive and Lake Drive, realigning and constructing a new portion of 77th Street W <br />between Marilyn Drive and Lake Drive, realigning and installing public utilities, <br />coordinating the relocation of private utilities, and working with Anoka County on signal <br />improvements. The estimated construction cost is $568,000.00. <br /> <br />Based on the project scope, WSB would perform the following tasks: <br /> <br />I. Prepare Final Project Construction Plans <br /> <br />Final construction plans will be prepared showing the new roadway alignment, public <br />utility locations, drainage ponds, and signal modifications. The plans will include <br />topographic survey and be shown in plan and profile views. <br /> <br />II. Final Quantities <br /> <br />A bid item quantity take off and engineer’s opinion of probable cost will be completed <br />on the final construction plans. A proposal form will be generated for the contractor <br />bidding process. <br /> <br />III. Prepare Permits, Specifications and Bidding Documents <br /> <br />WSB will assist the City in preparing permit application(s) and/or approval requests <br />and will assist the City with submitting the applications/approval requests to the <br />appropriate regulatory agencies. Permit applications and/or agency review <br />submittals are anticipated for: (1) RCWD – erosion control, and (2) Anoka County – <br />work in right of way. <br /> <br />WSB will develop the final project plans and specifications based on the agency <br />review comments. This task will include a constructability review and QA/QC review <br />of the final plans, quantities, and specifications. <br /> <br />Upon completion of permitting, and agency review and approval, a final set of <br />construction documents will be prepared for electronic bidding.
The URL can be used to link to this page
Your browser does not support the video tag.