My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-08-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
11-08-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 4:08:09 PM
Creation date
11/5/2021 3:51:49 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/08/2021
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY COUNCIL <br />AGENDA ITEM 6E <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br /> <br />MEETING DATE: November 8, 2021 <br /> <br />TOPIC: Resolution No. 21-132, Accepting Quotes and Awarding a <br />Construction Contract, 2021 Surface Water Maintenance Project <br /> <br />VOTE REQUIRED: 3/5 Vote Required <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting authorization to accept quotes and award the construction contract for the <br />2021 Surface Water Maintenance Project. <br /> <br />BACKGROUND <br /> <br />The City’s annual Surface Water Management Program (SWMP) addresses areas in need of <br />maintenance, and conforms to the City’s Surface Water Pollution and Prevention Plan. The City <br />will perform storm sewer repair and cleaning, vegetation removal, sediment removal, and pond <br />cleanings. This type of work is best completed in dry conditions or the winter season. <br /> <br />The 2021 Surface Water Maintenance Project includes eight project sites, shown in the table <br />below: <br /> <br />Funding for the project is through the Stormwater Maintenance Fund. <br /> <br />Quotes for the project were received on October 28th, 2021. <br /> <br />CONTRACTOR TOTAL QUOTE <br />Dimke Excavating Inc. $159,252.00 <br />Jacon LLC $203,288.00 <br />Olson’s Sewer Service/ Olson’s Excavating Services $243,883.39 <br />Dresel Contracting, Inc. $592,625.00 <br />Fuhr Trenching, Inc. Did Not Quote <br />C.W. Houle, Inc. Did Not Quote <br />AREA IMPROVEMENT <br />Site 1 (6206 Red Maple Lane) Ditch Maintenance – Sediment Removal <br />Site 2 (6257 Coyote Court) Ditch Maintenance – Sediment Removal <br />Site 3 (8093 Aenon Place) Pond and Ditch Maintenance – Sediment Removal <br />Site 4 (Reshanau Lake Estates South 3rd Addition) Ditch Maintenance – Sediment Removal <br />Site 5 (7879 Lois Lane) Ditch Maintenance – Sediment Removal <br />Site 6 (Oak Lane/Lino Park Pond) Pond Maintenance – Sediment Removal <br />Site 7 (6958 W Shadow Lake Drive) Ditch Maintenance – Sediment Removal <br />Site 8 (802/818 Orange Street) Ditch Maintenance – Sediment Removal
The URL can be used to link to this page
Your browser does not support the video tag.