Laserfiche WebLink
4 <br /> <br />BE IT FURTHER RESOLVED by The City Council of The City of Lino Lakes hereby <br />approves the preliminary plat and utility staging area for Nadeau Acres subject to the following <br />items being addressed: <br /> <br />1. Comments from WSB City Engineer memo dated April 27, 2020 shall be addressed. <br />2. Comments from the Environmental Coordinator memo dated April 23, 2020 shall be <br />addressed. <br />3. The applicant shall prepare the deeds for Outlots A, B, C, D and E for City review and <br />approval prior to recording. <br />a. Outlot C shall be dedicated for road right-of-way and drainage and utility <br />purposes. <br />4. The applicant shall prepare the temporary cul de sac easements for City review and <br />approval prior to recording. <br />5. Proof that the private septic systems at 6677 20th Avenue and 6651 20th Avenue have <br />been properly removed shall be submitted to the City upon completion. <br />6. Proof that the private well located at 6677 20th Avenue has been properly capped shall be <br />submitted to the City upon completion. <br />7. The applicant shall provide approval from NSP aka Xcel Energy allowing for public and <br />private improvement within their easement e.g. stormwater pond, landscaping, streets, <br />utilities etc. <br />8. “Future Road Extension” signs are required at the west end of William Lane and Red <br />Oak Lane and at the north end of Heritage Avenue. <br />a. These may be shown on the final plans. <br />9. Sheets 3-5, Preliminary Plat: <br />a. On Sheet 3, the density calculations shall be revised to subtract the “Proposed <br />Wetlands = 0.65 acres”. The Net Density then becomes 2.27 lots/acre. <br />b. A minimum10 foot wide drainage and utility easement upland from the delineated <br />wetland boundary is required. <br />i. The easement on Lot 2 and Lot 3, Block 1 shall be revised. <br />ii. The lot area summary Excel spreadsheet shall be revised. <br />10. Sheet 7, Preliminary Site & Utility Plan: <br />a. Southbound left, right and through lanes from CSAH 54 (20th Avenue) onto Red <br />Oak Lane shall be approved by Anoka County. <br />b. Proper turn lanes from Red Oak Lane onto CSAH 54 (20th Avenue) are required. <br />c. Utilities and services shall be provided for the future development of 6687 20th <br />Avenue on the final plans. <br />11. Sheet 9, Preliminary Grading Plan & Erosion Control Plan: <br />a. Revise comment “Ex. House to be Moved to Lot 136” to Lot 135. <br />12. Sheet L1 & L2, Preliminary Landscape Plan: <br />a. A row of coniferous trees shall be planted at the north end of Heritage Avenue to <br />provide a screen from vehicle headlights shining into the adjacent house located at <br />6747 20th Avenue. <br />13. Phasing Plan: <br />a. Phase I shall be revised to 35 lots. <br /> <br />Adopted by the Council of the City of Lino Lakes this 11th day of May, 2020. <br /> <br />