My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-11-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
05-11-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:29:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/11/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Watermark 3rd Addition <br />Development Agreement <br />May 11, 2020 <br /> page 8 <br />c. Sealcoating. The Developer will pay the cost of sealcoating the streets within the <br />development at a cost of $73,260. The sealcoating will be completed within <br />three to seven years following completion of the wear course placement. <br />d. GIS Mapping Fees <br />e. Trunk Sewer Connection Fees <br />The City established trunk utility connection fees to uniformly distribute the <br />costs of public trunk sanitary sewer infrastructure. The Trunk Utility Connection <br />Fee consists of two components; a Trunk Charge and an Availability Charge. <br /> <br />Trunk Charge <br /> <br />The trunk charge for Phase 3Ashall be paid at the time of subdivision approval or <br />at the time of hook-up, whichever is first. The trunk charge for Phase 3B shall be <br />paid prior to any work on Phase 3B. Residential trunk charges are based on one <br />unit per dwelling unit. Commercial/Industrial/Institutional (CII) trunk charges are <br />based on a factor of 2.92 units per acre. <br /> <br />Sanitary Sewer $1,606.00 Per Unit <br /> <br />Availability Charge <br /> <br />For residential properties, the availability charge for Phase 3Ashall be paid at the <br />time of subdivision approval or at the time of hook-up, whichever is first. The <br />availability charge for Phase 3B shall be paid prior to any work on Phase 3B. <br />Commercial/Industrial/Institutional availability charges shall be paid at the time <br />of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES). <br />Residential uses shall be assigned one unit per dwelling unit unless otherwise <br />noted by MCES. <br /> <br />City Sewer (CSAC) $1,502.00 Per SAC Unit <br /> <br />Trunk sewer unit charges addressed under this paragraph are in addition to any <br />SAC charges imposed by Metropolitan Council Environmental Services. An <br />estimate of the total charge and the trunk utility credit for de veloper installed <br />trunk oversizing is specified in Exhibit C. <br />f. Trunk Water Connection Fees
The URL can be used to link to this page
Your browser does not support the video tag.