My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-11-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
05-11-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:29:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/11/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Watermark 3rd Addition <br />Development Agreement <br />May 11, 2020 <br /> page 12 <br />agents or third parties. Any such costs shall be reimbursed from <br />Developer’s escrow. <br />18. Special Provisions. <br />a. Watermark 3rd Addition will be completed in 2 phases 3A and 3B. This <br />Agreement includes a Schedule C for each phase. Phase 3A shall include the <br />construction of the Stormwater Reuse System, and the Trail. Developer shall <br />post security, in a form acceptable to the City, for all fees and charges in Exhibit <br />C pertaining to Phase 3B that are being deferred until work begins in Phase 3B. <br />b. The Developer shall submit a sanitary sewer plan sheet, to be included with the <br />construction plans, for construction of the trunk sewer along 20th Ave from <br />manhole 9 where it exists today to Watermark Way. Said plan sheet shall be <br />approved by the City. <br />c. Outlot A is preserved as permanent Open Space and shall be improved by the <br />Developer in accordance with the approved plans and upon complet ion and <br />acceptance by the city of such improvements, it shall be owned and maintained <br />by a Homeowner’s Association in accordance with an approved Restoration and <br />Management Plan. <br />d. A separate fence permit is required for the fencing along CSAH 54 (20th Avenue). <br />19. Hours of Construction Activity. <br /> <br />All construction activity shall be limited to the hours as follows: <br />Monday through Friday 7:00 a.m. to 7:00 p.m. <br />Saturday 9:00 a.m. to 5:00 p.m. <br />Sunday and Holidays No working hours allowed <br /> <br />20. Insurance. Developer or its general contractor shall take out and maintain until one <br />year after the City accepted the Developer Improvements, public liability and property <br />damage insurance covering personal injury, including death, and claims for property <br />damage which may arise out of the Developer's or general contractor’s work, as the <br />case may be, or the work of its subcontractors or by one directly or indirectly employed <br />by any of them. Limits for bodily injury and death shall be not less than Five Hundred <br />Thousand and no/100 ($500,000.00) Dollars for one person and One Million and no/100 <br />($1,000,000.00) Dollars for each occurrence; limits for property damage shall be not less <br />than One Million and no/100 ($1,000,000.00) Dollars for each occurrence; or a <br />combination single limit policy of Two Million and no/100 ($2,000,000.00) Dollars or <br />more. The City, its employees, its agents and assigns shall be named as an additional <br />insured on the policy, and the Developer or its general contractor shall file with the City <br />a certificate evidencing coverage prior to the City signing the plat. The certificate shall
The URL can be used to link to this page
Your browser does not support the video tag.