My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-11-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
05-11-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:29:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/11/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />I-35E Corridor AUAR Update <br />April 15, 2020 <br />Page 1 <br />I-35E CORRIDOR AUAR UPDATE <br />This document provides for an update to the Lino Lakes I-35E Corridor AUAR. The original AUAR was <br />completed in 2005. Updates were adopted in 2010 and 2015. This document serves as the 2020 five-year <br />update. An abbreviated version of the EAW questionnaire form has been used for this update to assist in <br />the review of this AUAR Update. The following figures and appendices are included in this Update. <br /> <br />Figures <br />Figure 1 – Project Location <br />Figure 2 – Revised Scenario 1 <br />Figure 3 – Revised Scenario 2 <br />Figure 4 – 2030 Comprehensive Plan <br />Figure 5 – Developments <br />Appendices <br />Appendix A – Figures <br />Appendix B – Stormwater Management Memo <br />Appendix C – Water Appropriation Memo <br />Appendix D – Wastewater Management Memo <br />Appendix E – Transportation Memo <br />Appendix F – SHPO and DNR Information <br />Appendix G – Contamination Review Memo <br />Appendix H – Mitigation Plan <br />Appendix I – Responses to Comments <br /> <br /> <br /> <br />1. Project title: Lino Lakes I-35E Corridor AUAR Update <br /> <br /> <br />2. Proposer: NA 3. RGU City of Lino Lakes <br /> Contact person: Michael Grochala <br /> Title: Community Development Director <br /> Address: 600 Town Center Pkwy <br /> City, State, ZIP: Lino Lakes, MN 55014 <br /> Phone: (651) 982-2427 <br /> Email: mgrochala@linolakes.us <br /> <br />4. Reason for EAW Preparation: (check one) <br /> <br />NA <br /> <br />5. Project Location: <br />County: Anoka <br />City/Township: Lino Lakes <br /> <br />6. Project Description: <br />Overview <br />The City of Lino Lakes adopted the I-35E Corridor AUAR in conformance with Minnesota Rules 4410 <br />in 2005. The City has subsequently updated the AUAR every five years. The AUAR study area is <br />approximately 4,500 acres and is located in the northeastern portion of the City as shown in Figure 1. <br /> <br />Development Scenarios <br />Three development scenarios were included in the 2005 AUAR and Updates. The City has since <br />updated its 2040 Comprehensive Plan and reviewed the scenarios. Three updated scenarios are <br />included in this update and are consistent with the original AUAR. These revised scenarios are within <br />the original density thresholds of the original AUAR. <br /> <br />Revised Scenario 1 – Draft 2040 Full Build Out Land Use <br />This scenario is in conformance with the current, draft 2040 Comprehensive Plan. This scenario <br />has a higher industrial use and less residential than the Revised Scenario 2. It is still within the <br />assumptions of the original AUAR. Table 1 provides a summary of this uses for this scenario.
The URL can be used to link to this page
Your browser does not support the video tag.