My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-11-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
05-11-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:29:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/11/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Water.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Final Technical Memorandum <br /> <br />To: Michael Grochala, City of Lino Lakes <br /> <br />From: Jon Christensen, WSB <br />Andi Moffatt, WSB <br /> <br />Date: April 8, 2020 <br /> <br />Re: Water Appropriations – I-35 Corridor AUAR <br /> City of Lino Lakes, Minnesota <br /> WSB Project No. R-015144-000 <br /> <br /> <br />INTRODUCTION <br /> <br />The original Alternative Urban Areawide Review (AUAR) was completed and approved in <br />September 2005. The AUAR analyzed the stormwater impacts of the three development <br />scenarios. Based on the analysis, a Mitigation Plan was developed. <br /> <br />AUAR updates are required every five years from the original date of the approved AUAR. <br />Updates were prepared in 2010 and 2015. Each assumed no change in the proposed <br />development land use scenarios and included discussion of mitigation improvements that had <br />been completed at the time. Since the 2015 AUAR update was prepared, the City has completed <br />an updated Comprehensive Plan. This AUAR Update includes review of three scenarios. <br /> <br />The information and analysis outlined within this memo is intended to complete a portion of the <br />AUAR Update related to Item # 11.b.iii – Water Resources – Water Appropriation related to <br />revising of the three scenarios. This memo is intended to update the water analysis provided in <br />the original AUAR where applicable. <br /> <br />WATER RESOURCES – WATER APPROPRIATIONS <br /> <br />11.b.iii - Water appropriation - Describe if the project proposes to appropriate surface or <br />groundwater (including dewatering). Describe the source, quantity, duration, use and purpose of <br />the water use and if a DNR water appropriation permit is required. Describe any well <br />abandonment. If connecting to an existing municipal water supply, identify the wells to be used as <br />a water source and any effects on, or required expansion of municipal water infrastructure. <br />Discuss environmental effects from water appropriation, including an assessment of the water <br />resources available for appropriation. Identify any measures to avoid, minimize, or mitigate <br />environmental effects from the water appropriation. <br /> <br />Existing Conditions <br />Currently, the majority of the study area is served by private wells. The Minnesota Well Index <br />indicates there are approximately 90 wells within the study area which are nearly all for domestic <br />use. No information is available regarding these private wells beyond the Minnesota Well Index. <br /> <br />The municipal water supply system has a DNR water appropriation permit. The water distribution <br />system exists in the southern portion of the study area and currently extends north of Main Street <br />on either side of I-35E. The system will continue to be extended as development progresses.
The URL can be used to link to this page
Your browser does not support the video tag.