My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-11-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
05-11-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:29:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/11/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Final Technical Memorandum <br /> <br />To: Michael Grochala, City of Lino Lakes <br /> <br />From: Jon Christensen, WSB <br />Andi Moffatt, WSB <br /> <br />Date: April 8, 2020 <br /> <br />Re: Wastewater Management – I-35 Corridor AUAR <br /> City of Lino Lakes, Minnesota <br /> WSB Project No. R-015144-000 <br /> <br /> <br />The original Alternative Urban Areawide Review (AUAR) was completed and approved in <br />September 2005. The AUAR analyzed the wastewater impacts of the three development <br />scenarios. Based on the analysis, a Mitigation Plan was developed. <br /> <br />AUAR updates are required every five years from the original date of the approved AUAR. <br />Updates were prepared in 2010 and 2015. Each assumed no change in the proposed <br />development land use scenarios and included discussion of mitigation improvements that had <br />been completed at the time. Since the 2015 AUAR update was prepared, the City has completed <br />an updated Comprehensive Plan. This AUAR Update includes review of three scenarios. <br /> <br />The information and analysis outlined within this memo is intended to complete a portion of the <br />AUAR Update related to Item # 11.b.i – Water Resources – Wastewater related to revising of the <br />three scenarios. This memo is intended to update the wastewater analysis provided in the original <br />AUAR where applicable. <br /> <br />WATER RESOURCES – WASTEWATER <br /> <br />Describe effects from project activities on water resources and measures to minimize or mitigate <br />the effects in Item b.i. through Item b.iv. below. <br /> <br />i. Wastewater - For each of the following, describe the sources, quantities and <br />composition of all sanitary, municipal/domestic and industrial wastewater produc ed or <br />treated at the site. <br />1) If the wastewater discharge is to a publicly owned treatment facility, identify <br />any pretreatment measures and the ability of the facility to handle the added <br />water and waste loadings, including any effects on, or required exp ansion of, <br />municipal wastewater infrastructure. <br />2) If the wastewater discharge is to a subsurface sewage treatment systems <br />(SSTS), describe the system used, the design flow, and suitability of site <br />conditions for such a system. <br />3) If the wastewater discharge is to surface water, identify the wastewater <br />treatment methods and identify discharge points and proposed effluent <br />limitations to mitigate impacts. Discuss any effects to surface or groundwater <br />from wastewater discharges. <br />
The URL can be used to link to this page
Your browser does not support the video tag.