My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-11-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
05-11-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:29:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/11/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Grochala <br />April 8, 2020 <br />Page 7 <br /> <br /> <br />K:\015144-000\Admin\Docs\AUAR - Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx <br />Review and Update of the Mitigation Plan <br />The table below provides the mitigation plan for wastewater management. These mitigation measures have been reviewed and revised as <br />needed for this AUAR Update. <br /> <br />Table 12. Water Quality: Wastewater <br />Item No. Mitigation Description Update <br />18.1 Monitor wastewater flows and not permit new development to proceed if it <br />exceeds the capacity of the wastewater system. <br />This mitigation measure is ongoing. <br />18.2 Construct the major infrastructure improvements needed to expand the <br />capacity of the wastewater system (i.e. lift stations, forcemains, and <br />upgrades to the existing systems) in accordance with the Comprehensive <br />Sanitary Sewer Plan and Capital Improvement Plan. <br />This mitigation measure is ongoing. <br />18.3 Adequately phase capacity improvements. This mitigation measure is ongoing. <br />18.4 Amend the Comprehensive Sanitary Sewer Plan and Capital Improvement <br />Plan to be consistent with any amendments to the Comprehensive Plan <br />that would necessitate expansions or alterations to the sanitary sewer <br />system and regional capacity needs. <br />This mitigation measure is ongoing. No <br />updates have been needed to date for the <br />study area. <br />18.5 Each proposed development will be required to provide a detailed <br />projection of wastewater generation and flows. These calculations will be <br />checked by the City’s Engineering Consultant. <br />This mitigation measure is ongoing. <br />18.6 The City will create a year-end report to evaluate wastewater increases by <br />major sewer lines and overall system usage in relation to capacity. Results <br />of this assessment will become the targets for growth for the following year. <br />This mitigation measure is ongoing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.