My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-26-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
05-26-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:38:45 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/26/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 617 Apollo Drive – Muddy Cow Site Performance Agreement page 3 of 10 <br />Trunk Charge <br /> <br />The trunk charge shall be paid at the time of subdivision approval or at the <br />time of hook-up, whichever is first. The Sanitary Sewer Trunk Charge is <br />$1,606.00 per unit. Commercial/Industrial/Institutional (CII) trunk charges <br />are based on a factor of 2.92 units per acre. No trunk charge will be <br />collected for this site as it was previously subdivided. <br /> <br />Availability Charge <br /> <br />For residential properties, the availability charge shall be paid at the time <br />of subdivision approval or at the time of hook-up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the <br />time of building permit. Fees are based on the number of sanitary access <br />charge (SAC) units assigned by Metropolitan Council Environmental <br />Services (MCES). <br /> <br />City Sewer (CSAC) $1,502.00 Per SAC Unit <br /> <br />Trunk sewer unit charges addressed under this paragraph are in addition to <br />any SAC charges imposed by Metropolitan Council Environmental <br />Services. <br />B. Trunk Water Connection Fees <br />The City established trunk utility connection fees to uniformly distribute <br />the costs of public trunk water infrastructure. The Trunk Utility <br />Connection Fee consists of two components; a Trunk Charge and an <br />Availability Charge. <br />Trunk Charge <br /> <br />The trunk charge shall be paid at the time of subdivision approval or at the <br />time of hook-up, whichever is first. The Water Trunk Charge is $2,306.00 <br />per unit. Commercial/Industrial/Institutional (CII) trunk charges are based <br />on a factor of 2.92 units per acre. No trunk charge will be collected for this <br />site as it was previously subdivided. <br /> <br />Availability Charge <br /> <br />For residential properties, the availability charge shall be paid at the time <br />of subdivision approval or at the time of hook-up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the <br />time of building permit. Fees are based on the number of sanitary access <br />charge (SAC) units assigned by Metropolitan Council Environmental <br />Services (MCES).
The URL can be used to link to this page
Your browser does not support the video tag.