My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-01-2020 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
06-01-2020 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:39:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/01/2020
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />a1, draft lino lakes 2020-2024 street reconstruction plan 2020v11 5/29/2020 <br /> <br />through wetlands with surface water one foot below the roadway. Large ptoholes have occurred in <br />many areas of the roadway. In order to reconstruct the road, the roadway will need drainage issues <br />corrected . The road reconstruction project will include reconstructing the street to meet the City’s <br />standard road requirements, improvement of the drainage system to keep stormwater from <br />compromising the new roadway, and meeting the Rice Creek Watershed District’s rate control and <br />water quality treatment requirements related to the construction of the new roadway. The road <br />reconstruction project will also include investigating the conditions of the County Ditch culvert under <br />the roadway and reconstructing the culvert if necessary. <br /> <br />Karth Area Improvements <br />The pavement of streets within the Karth Area are also in very poor condition. The road <br />reconstruction project will include reconstructing the street to meet the City’s standard road <br />requirements, improvement of the drainage system to keep stormwater from compromising the new <br />roadway and meeting the Rice Creek Watershed District’s rate control and water quality treatment <br />requirements related to the construction of the new roadway. <br /> <br />Street reconstruction bonds are included in the amount of indebtedness of the City which cannot, <br />under Minnesota Statutes, Section 475.53, exceed 3% of the assessor’s taxable market value for the <br />City (“TMV”). The proposed bonds will not exceed statutory limits. <br /> <br />All other foreseeable capital expenditures are expected to be financed through other revenue or <br />financing sources. <br /> <br />2024 Street Reconstruction Project <br /> <br />The 2024 Street Reconstruction Project includes the reconstruction of the following streets; <br />Evergreen Trail, Diane Street, and Red Maple Lane by replacement of curb and gutter as needed, <br />required upgrades of the existing stormwater management system and bituminous surfacing. <br /> <br />No bonds are being contemplated for this project at the present time.
The URL can be used to link to this page
Your browser does not support the video tag.