My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-08-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
06-08-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:39:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/08/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY COUNCIL <br />AGENDA ITEM 5B <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee PE, City Engineer <br /> <br />MEETING DATE: June 8, 2020 <br /> <br />TOPIC : Lift Station No. 5 Forcemain Project Restoration <br /> <br />i. Consider Resolution No. 20-54, Accepting Quotes, <br />Pavement Restoration <br />ii. Consider Resolution No. 20-58, Accepting Quotes, <br />Concrete Restoration <br /> <br />VOTE REQUIRED: 3/5 Vote Required <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting authorization to accept quotes for the Lift Station No. 5 Forcemain Project <br />Restoration. <br /> <br />BACKGROUND <br /> <br />On April 27, 2020 the City Council approved a construction contract to install a new forcemain <br />from lift station no. 5 to the gravity sewer in Timberwolf Dr. This work occurred along Snow <br />Goose Circle and Pheasant Hills Drive. The forcemain installation contract intentionally did not <br />include site restoration work. The new forcemain has been installed and area is ready for <br />restoration. <br /> <br />The low quote for pavement restoration was submitted by Bituminous Roadways, Inc. of <br />Mendota Heights, Minnesota, in the amount of $25,200.00. This includes $11,000.00 of trail <br />paving, the remainder is multiple roadway repairs. The low quote for concrete restoration was <br />submitted by CR Fischer & Sons, Inc. of Farmington, Minnesota, in the amount of $10,700.00. <br />This includes a driveway repair and curb and gutter replacement. Funding for the project is from <br />the Water Operating Fund. The City’s public works department will be involved with other <br />portions of the site restoration including landscape and irrigation repairs and sod/seeding. <br /> <br />The start date for this project is the week of June 15, 2020. <br /> <br />RECOMMENDATION <br /> <br />Staff recommends adoption of Resolutions No. 20-54 and No. 20-58 accepting quotes for the Lift <br />Station No. 5 Forcemain Project Restoration. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.