Laserfiche WebLink
Feasibility Study <br />Water Treatment Plant <br />City of Lino Lakes, MN <br />WSB Project No. 015822-000 Page 5 <br />2.4 Distribution <br />The distribution watermains range in diameter from 6-inch to 16-inch and are shown in Figure 1 <br />in Appendix A. The pipe materials include ductile iron pipe (DIP), polyvinyl chloride (PVC), and <br />high density polyethylene (HDPE). The 16-inch trunk watermains run between the City’s three <br />water towers. <br />2.5 Booster Station <br />The City has one booster station that increases the pressures within the Clearwater Creek <br />development at the southeastern extents of the system, south of Well No. 4. <br />2.6 Interconnections <br />The City of Lino Lakes water distribution system has seven interconnections with five neighboring <br />communities, as well as two interconnections with the Minnesota Correctional Facility located <br />within Lino Lakes, as shown on Figure 2 in Appendix A. The Lino Lakes water towers share a <br />common high water level (HWL) of 1,054.5 feet. The HWLs of the neighboring systems are listed <br />in Table 2-3. <br />Table 2-3. Interconnection HWL Elevations <br />City Quantity Water Tower No. 1 <br />(feet) <br />Water Tower No. 2 <br />(feet) <br />Water Tower No. 3 <br />(feet) <br />Blaine 1 1,053.37 1,053.70 1,063.70 <br />Shoreview 1 1,092.5 1,092.5 N/A <br />Circle Pines 1 1,060 N/A N/A <br />Centerville 2 1,054.58 N/A N/A <br />Hugo 2 N/A*1,055.5 1,084.0