My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-06-2020 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
07-06-2020 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 2:38:35 PM
Creation date
11/17/2021 11:41:31 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/06/2020
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Study <br />Water Treatment Plant <br />City of Lino Lakes, MN <br />WSB Project No. 015822-000 <br />7.1 Potential Sites and Land Acquisition .........................................................................21 <br />7.2 Water Treatment Plant Building ..................................................................................21 <br />7.2.1 Architecture .......................................................................................................21 <br />7.2.2 Detention ............................................................................................................22 <br />7.2.3 Filters ..................................................................................................................22 <br />7.2.4 High Service Pump Room ...............................................................................22 <br />7.2.5 Chemical Rooms ..............................................................................................22 <br />7.2.6 Electrical Room .................................................................................................22 <br />7.2.7 Generator Room ...............................................................................................22 <br />7.2.8 Mechanical/Blower Room ...............................................................................22 <br />7.2.9 Storage Room ...................................................................................................22 <br />7.2.10 Office/Control Room/Laboratory ....................................................................22 <br />7.2.11 Clearwell ............................................................................................................22 <br />7.2.12 Backwash Tank.................................................................................................22 <br />7.3 Conceptual Site Plan ....................................................................................................23 <br />7.4 Public Utilities ................................................................................................................23 <br />7.5 Private Utilities ...............................................................................................................23 <br />7.6 Water Treatment Facility Impacts...............................................................................24 <br />8. WATER DISTRIBUTION SYSTEM MODELING ..............................................................25 <br />8.1 Existing System Impacts ..............................................................................................25 <br />8.2 Proposed Watermain Phasing ....................................................................................26 <br />9. ESTIMATED COSTS AND FUNDING OPTIONS .............................................................27 <br />9.1 Water Treatment Plant Financial Analysis ................................................................28 <br />9.2 Future Trunk Watermain Improvements Financial Analysis ..................................28 <br />9.3 Future Well Nos. 7 and 8 Raw Watermain Improvements Financial Analysis ....28 <br />10. RECOMMENDATIONS .........................................................................................................30 <br />APPENDIX A - Figures <br />Figure 1 Existing Water Supply System <br />Figure 2 Neighboring Water Supply Systems <br />Figure 3 Potential WTP Site <br />Figure 4 Conceptual Site Plan <br />Figure 5 Existing Public Utilities <br />Figure 6 Proposed Raw Watermain <br />Figure 7 Proposed Watermain Phasing <br />APPENDIX B - Water Quality Analysis Results <br />APPENDIX C - Anoka County Geologic Atlas <br />APPENDIX D - Modeling Results <br />APPENDIX E - Cost Tables
The URL can be used to link to this page
Your browser does not support the video tag.