Laserfiche WebLink
9 <br />•Floor plan is 37,284 sf <br />•3 working bays, 2 shop areas, 6 classrooms, several offices, 100 seat auditorium, <br />storage, toilet rooms, utility rooms and hallways. <br />•Second floor mezzanine is proposed over the working bays. <br />•Trash enclosure with rockface CMU to match buildings <br />•Mechanical equipment located inside building <br />•No outdoor storage is allowed <br />•Photometric plan meets foot candle requirements <br />•Down lit exterior lights