My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-27-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
07-27-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 2:38:36 PM
Creation date
11/17/2021 11:45:49 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/27/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br />CITY COUNCIL <br />AGENDA ITEM 6C <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br /> <br />MEETING DATE: July 27, 2020 <br /> <br />TOPIC: Street Easement Vacation <br />i) Consider 2nd Reading of Ordinance No. 04-20, Vacating <br />Elmcrest Avenue Street Easement <br /> *Council may vote to dispense with the full reading of the ordinance <br /> *Roll call vote is required for adoption of the ordinance <br /> <br />ii) Consider Resolution No. 20-79, Approving Summary <br />Publication of Ordinance No. 04-20 <br /> <br /> <br />VOTE REQUIRED: 4/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting City Council consider the 2nd Reading of Ordinance No. 04-20, Vacating <br />Elmcrest Avenue Street Easement. <br /> <br />BACKGROUND <br /> <br />Laborer’s Training Center (LTC) is located at 2350 Main Street. LTC applied for a <br />Conditional Use Permit to construct an additional building on the lot. The applicant is <br />proposing to construct a 37,284 sf training facility to the east of the existing facility. As part of <br />this work, the applicant is also proposing to expand parking facilities, improve the existing site <br />entrance off of Victor Path, extend water and sanitary services, and install storm sewer and <br />storm water ponds. <br /> <br />The applicant has requested a vacation of a portion of the Elmcrest Avenue street easement on <br />the east side of the property, as shown on the enclosed map. The easement is to remain in place <br />over Victor Path. Portions of this street easement have been previously vacated due to the <br />Victor Gardens project in the City of Hugo. A drainage and utility easement was retained over <br />the previously vacated area. <br /> <br />ANALYSIS <br /> <br />The proposed changes include vacating a portion of the street easement. The developer’s <br />engineer has submitted the proposed easement vacation which was reviewed and approved by <br />City staff. The proposed easement vacation is to accommodate improvements to the site
The URL can be used to link to this page
Your browser does not support the video tag.