Laserfiche WebLink
2021 BUDGET <br /> <br />ASPHALT SAW <br />$4,500 <br /> <br />  <br />City staff was requested to research the potenƟal of acquiring a trail paver and performing trail replacement  <br />projects in‐house. We have concluded that Public Services staff would be beƩer equipped for trail mainte‐ <br />nance/minor repairs as opposed to full trail replacement at this Ɵme.  In addiƟon to being very labor inten‐ <br />sive, renƟng a trail paver runs about $10,000 per month. Purchasing would be cost prohibiƟve.  <br />In exploring this concept, we have determined that it would be feasible for the Streets Department to con‐ <br />duct minor trail repairs during the Fall. Crews would not replace large segments of paved trail, but rather  <br />perform spot maintenance in segments that need the most aƩenƟon.  The goal would be to temporarily im‐ <br />prove user safety unƟl the trail is eventually replaced.  Maintenance would primarily be repairing uneven  <br />surfaces and cracks from tree roots, poor subgrade, etc.    <br />The Public Services Department already possesses a majority of the necessary equipment. However a wheel  <br />mounted walk behind 20” asphalt saw ($3,000) would need to be purchased.  This tool would allow staff to  <br />cut out secƟons of asphalt and provide clean straight edges at patch seams. AddiƟonal hand tools, small  <br />power equipment, air compressor accessories, and signage is also budgeted.  <br />Recommended funding is the General ‐ Parks Department, Small Tools.  <br />94