HomeMy WebLinkAbout08-03-2020 Council work Session PacketCITY COUNCIL WORK SESSION AGENDA
CITY OF LINO LAKES
Monday, August 3, 2020
Council Chambers
6:00 P.M.
1. Nature’s Refuge Final Plat, Katie Larsen
2. Birch Street Roundabout Landscaping, Michael Grochala
3. CARES Act Proposed Expenditures, John Swenson
4. Council Updates on Boards/Commissions, City Council
5. Review Regular Agenda
6. Adjourn
WS – #1
WORK SESSION STAFF REPORT
Work Session Item No. 1
Date: August 3, 2020
To: City Council
From: Katie Larsen, City Planner
Re: Nature’s Refuge PUD Final Plan/Final Plat
Background
Staff will present the attached August 10, 2020 regular Council agenda item regarding
Nature’s Refuge PUD Final Plan/Final Plat.
Attachments
1. August 10, 2020 Agenda Item 6A
a. Please note Attachment 6-Development Agreement is To Follow
Requested Council Direction
None. Discussion Only.
1
CITY COUNCIL
AGENDA ITEM 6A
STAFF ORIGINATOR: Katie Larsen, City Planner
MEETING DATE: August 10, 2020
TOPIC: Nature’s Refuge
i. Consider Resolution No. 20-81 approving PUD Final
Plan/Final Plat
ii. Consider Resolution No. 20-82 approving Development
Agreement
VOTE REQUIRED: 3/5
INTRODUCTION
The applicant, Preferred Builders, Inc., submitted a land use application for PUD Final
Plan/Final Plat for Nature’s Refuge. The proposed residential development is a 61 lot single
family conservation subdivision located north of Main Street and west of Lino Lakes
Elementary School. The development contains 3 parcels totaling approximately 95 gross acres.
This plan review is based on the following revised plan sets:
• Sanitary Sewer, Watermain, Storm Sewer and Street Construction Plans prepared by
Carlson McCain dated January 16, 2020
• Grading, Development & Erosion Control Plans prepared by Carlson McCain dated
March 6, 2020
• Preliminary Plat and Plan Set prepared by Carlson McCain dated June 12, 2019
• Stormwater Management Plan prepared by Carlson McCain dated June 7, 2019
• Net Area Exhibit prepared by Carlson McCain dated June 12, 2019
• Site Landscape Plan prepared by Carlson McCain dated June 27, 2019
• Final plat prepared by Carlson McCain received April 28, 2020
Previous Council Actions:
• June 25, 2018: Ordinance No. 05-18 approving the rezoning of property from R-1,
Single Family Residential to PUD, Planned Unit Development
• June 25, 2018: Resolution No. 18-70 approving PUD Development Stage
Plan/Preliminary Plat
BACKGROUND
Zoning
2
On June 25, 2018, Council adopted Ordinance No. 05-18 approving the rezoning of the
property from R-1, Single Family Residential to PUD, Planned Unit Development to provide
the following flexibilities:
1. Reduced minor collector road right-of-way width from 80 feet to 60 feet on Street A
and Street C
2. Reduced front setback from 40 feet to 30 feet on Street A (Glenwood Drive) and Street
C
3. Reduced paved road surface width from 32 feet to 30 feet (back to back) on cul de sac
Street D and cul de sac Street E
Street A is now Glenwood Drive. Street B is Basswood Drive. Street C is Haywood Drive.
Street D is Hazelwood Court. Street E is Elmwood Court.
Density
The site is guided for low density residential development which requires a density of 1.6 to 3.9
units per net acre. The revised net density is 1.68 units per acre which is consistent with the
Comprehensive Plan’s guided land use and density. Wetlands and wetland buffers make up 57
acres (60%) of protected open space.
The following chart implements Met Council’s formula for calculating net density.
Preliminary
Plat
(6-15-18)
Revised
Preliminary
Plat
(6-12-19)
Gross Area (acres) 95.05 95.05
Wetlands & Water Bodies (42.33) (42.33)
Public Parks & Open Space 0.00 0.00
Art erial ROW (1.33) (1.33)
Other (Utility Transmission Easement) (0.40) (0.40)
Other (Wetland Buffer Area) (15.10) (14.73)
Net Area (acres) 35.89 36.26
# of Units 61 61
Gross Density (units/acre) 0.64 0.64
3
Net Density (units/acre) 1.70 1.68
Zoning Requirements
The site was rezoned to PUD, Planned Unit Development with Ordinance No. 05-18 to allow
flexibility in right-of-way width and setback from minor collector road. The regulations and
performance standards of the R-1, Single Family Residential zoning district will be in effect
unless otherwise stated in Council resolution or Development Agreement.
Lot Comparison R-1 vs. Nature’s Refuge
Standard R-1
Requirements
Proposed Nature’s
Refuge
Min. Lot Size1 10,800 sf Min. = 10,800 sf
Ave. = 13,164 sf
Min. Lot Width 80 ft Min. = 80 ft
Min. Lot Depth 135 ft Min. = 135 ft
Building Setback (feet)
-From Local Streets 30 ft 30 ft
-From Collector or
Arterial Streets 40 ft 30 ft (Street A-E)2
40 ft (Main Street)
-Rear
--Principal 30 ft 30 ft
-Accessory 5 ft 5 ft
-Side
--Principal 10 ft 10 ft
--Accessory 5 ft 5 ft
Buffer Adjacent to
Collector 15 foot Provided
Impervious Surface 40% Verified with Building
Permits
1Net area required is 10,800 sf of contiguous buildable land
2PUD flexibility approved by Council
A 15 foot wide landscape buffer has been provided along CSAH 14 (Main Street) outside of the
existing 100 foot wide private utility easement and is contained in an outlot that will be owned
and maintained by a homeowner’s association (HOA). A 6 foot high privacy fence is proposed
along Lot 1, Block 6 that will provide screening along CSAH 14. Shrubs and plantings are
provided along the exterior side of the fence.
Building Type and Construction
4
At the time of building permit, each individual single family dwelling unit will be reviewed for
compliance with Section 1007.043(2)(a) General Building Provisions and the R-1, Single
Family Residential requirements regarding floor area, garage and design, and construction
standards.
Subdivision Ordinance
Conformity with the Comprehensive Plan and Zoning Code
Resolution No. 18-70 approving the PUD Development Stage Plan/Preliminary Plat details in
the findings conformity with the comprehensive plan and zoning code. The PUD Final
Plan/Final Plat is consistent with the PUD Development Stage Plan/Preliminary Plat.
Blocks and Lots
The preliminary plat has 61 single family lots and 6 outlots. The final plat has 61 single family
lots, but 7 outlots. Outlot G has been added. It contains an existing detached structure
belonging to 801 Main Street. This outlot will be deeded to 801 Main Street and combined.
The detached structure will then be legally located on their property. The remaining outlots are
for stormwater management facilities, wetland areas, open space, and trail corridors.
Ownership of each outlot (City, HOA, developer etc.) shall be as follows and detailed in the
Homeowner’s Association (HOA) documents.
Outlot Purpose Ownership
A Wetlands HOA
B Lake 300, wetland, open space and
trail corridor HOA
C Trail Corridor HOA
D Lake 200, Pond 100, Pond 400,
wetland, open space & trail HOA
E Trail & Utility Corridor HOA
F Landscape Buffer & fence HOA
G 801 Main Street-Detached Shed Deed to 801 Main St and
combine
Streets and Alleys
CSAH 14 (Main Street) is a Principal Arterial road. Streets A (Glenwood Drive) and Street C
(Haywood Drive north of Glenwood Drive) are identified as minor collector roads in the
Transportation Plan and provide a north-south corridor. The 1999 Anoka County TH
242/CSAH 14 Access Management Plan identifies at-grade full access at Wood Duck Trail and
CSAH 23 (Lake Drive) and restricted movements along the site’s corridor. The site plan has
been reviewed by Anoka County Highway Department. They have identified the need for
additional right-of-way (70-75 feet) and right and left turn lanes on CSAH 14 (Main Street).
5
Twelve foot wide east bound and west bound turn lanes have been shown on the site plan.
Detailed construction plans have been submitted with the PUD Final Plan/Final Plat and are
being reviewed by Anoka County.
The internal road system (Streets A thru C) has 60 foot wide right-of-ways and 32 foot wide
(back to back) paved road surface. Street D (Hazelwood Court) and Street E (Elmwood Court)
are cul de sacs with 60 foot wide right-of-way and 30 foot wide (back to back) paved road
surface. The intersection of Street A and CSAH 14 (Main Street) has an 80 foot wide right-of-
way and 42 foot wide (back to back) paved road surface. Sidewalks are proposed along the
east side of both Glenwood Drive and Haywood Drive.
Haywood Drive terminates in a temporary dead-end to the west, abutting 8024 Wood Duck
Trail. This stub provides opportunity for future extension and residential development to Wood
Duck Trail. This is consistent with the County Access Management Plan. Haywood Drive also
terminates in a temporary cul de sac to the north and provides opportunity for future extension
to the north.
Street B (Basswood Drive) provides future access to Lino Lakes Elementary School to the east.
In 2017, the school began a building remodeling and parking lot reconstruction project. An
opportunity to eliminate the school’s west driveway and connect with Nature’s Refuge was
identified as a safety benefit. The City and Anoka County are working with the school district
to complete this connection. Ultimately, it is the school districts decision when to make this
connection.
Easements
Standard drainage and utility easements at least 10 feet wide are provided along all lot lines.
Easements at least 20 feet wide are provided over utility pipes.
Drainage and utility easements are dedicated 10 feet above the high water level over
stormwater drainage ponds and 10 feet outward from the delineated wetland boundary. This
requirement is satisfied because easements have been dedicated over the entire outlots. Rear
lot lines also have a minimum 10 foot wide easement.
A 100 foot wide private utility easement in favor of Great River Energy exists along the
southern boundary of the development.
Landscaping shall be allowed in the drainage and utility easements covering the 15 foot wide
landscape buffer area in Outlot E and Outlot F.
Storm Water Management and Erosion and Sediment Control
Per the revised Stormwater Management Plan prepared by Carlson McCain dated June 7, 2019,
all of the site’s stormwater eventually flows to ACD 32 and to the west. Stormwater leaves the
project boundary at two locations: via ACD 32 and a small portion of the property discharges to
a ditch along Main Street. The total proposed post-development impervious surface area is
approximately 10.4 acres.
6
Soils on the site are classified as Hydrologic Soil Group A/D. Groundwater elevations ranged
from 898 feet to 904 feet.
The revised Stormwater Management Plan and plan sheets identify four (4) stormwater ponds,
two (2) infiltration basins and Wetland C on site. Wetland C will be enhanced and excavated to
provide extended storage of treated stormwater. Pond 100 and Pond 400 are required for
stormwater management. Pond 200 and Pond 300 are material excavation ponds. The storm
water ponds and trails are located near the wetlands and upland buffers. This strategic design is
the basis of the City’s greenway system by creating a multi-functional greenway corridor
intended to provide areas for stormwater management, upland buffers for wetland protection
and natural resource conservation, and open space and trails for people.
A ma intenance access trail is provided around Pond 200. This access trail will be graded, but
will not require gravel or paved improvements.
The site will be mass graded in one (1) phase. Residential home development will occur over
several years.
Utilities
Public water, sanitary and storm sewer utilities will be installed within the development.
Sanitary Sewer
A 21” trunk sanitary sewer main located along CSAH 14 (Main Street) serves the site. An 8”
and 10” sanitary sewer pipe serves the site internally. Future development to the north will
potentially require a lift station. Sanitary sewer will also be stubbed to the west to
accommodate future development.
Watermain
A 12” trunk watermain located along CSAH 14 (Main Street) serves the site. An 8” and 16”
watermain serve the site internally and loops the system to CSAH 14 (Main Street). Watermain
will be stubbed to the west and north property boundaries for future development.
Public Land Dedication
The City will require cash in lieu of land dedication. Per the City’s Park, Greenway & Trail
System Plan, a neighborhood park is not programmed for this area. Lino Lakes Elementary
School is immediately adjacent to the development.
Nature’s Refuge
61 lots x $3,000 = $183,000
Trail Construction Costs Credit = ($55,000)
TOTAL = $128,000
7
The Park, Greenway & Trail System Plan identifies the need for a future city trail running
north-south through the development along greenway corridor. Due to concerns regarding
potential impacts to the rare plant species behind Lots 1-4, Block 5, an 8.5 foot wide paved trail
will be constructed on the west side of the development along Pond 100 and 200 utilizing the
maintenance access path.
Outlot C of the revised plans accommodates a 25 foot wide trail corridor as required in the
original review comments.
Plans have been revised to show a future 10 foot wide trail along CSAH 14 (Main Street). The
timing of this trail construction is based on availability of funds and acquisition of additional
right-of-way along those parcels not part of the plat (e.g. 625 and 635 Main Street). The
section of sidewalk extending along Street A from Main Street to Street B has been revised to
an 8 foot wide concrete sidewalk.
Credit has been given for trail construction costs.
The Park Board reviewed the plans on February 5, 2018. The Board recommends collecting
park fees to potentially fund enhancements at Lino Lakes Elementary School.
Tree Preservation
The goal of tree preservation is to minimize unnecessary loss of habitat, biodiversity and forest
resource and to replace removed trees in areas where tree cover is most critical. The revised
Tree Inventory Report prepared by Carlson McCain dated June 15, 2018 identifies 1,151
significant trees on site and per Sheet L1, 415 existing trees will remain. The Tree Preservation
Plan identifies the basic use area and environmentally sensitive areas. There are 201 trees
within these areas proposed for removal. This requires 138 replacement trees for mitigation.
The developer and Environmental Coordinator determined the best location for replacement
trees along trail corridors and open space areas.
The Environmental Coordinator also reviewed the Tree Preservation Plan and made
suggestions for removal of hazardous or unhealthy trees. There are 14 non-significant trees
proposed for removal. No mitigation is required for these trees.
Landscaping
Boulevard trees are required at the rate of one (1) tree per lot frontage for single family. There
are 61 single family lots requiring 66 boulevard trees. There are 84 boulevard trees proposed
which is compliant with the ordinance.
Open area landscaping standards required 1 large tree and 3 large shrubs per 2,000 sf. Per the
Landscape Plan, there is 432, 506 sf of open area requiring 216 overstory trees and 661 large
shrubs. Sheet L1 indicates 415 existing trees plus an additional 216 open area trees and 661
shrubs which is compliant with the ordinance. Special attention has been made to create a
landscape buffer along the west side of the development abutting the residential properties
along Wood Duck Trail.
8
A 15 foot wide landscape buffer has been provided along CSAH 14 (Main Street) outside of the
existing 100 foot wide private utility easement and is contained in an outlot that will owned and
maintained by a homeowner’s association (HOA). A 6 foot high privacy fence is proposed
along Lot 1, Block 7 that will provide screening along CSAH 14. Shrubs and plantings are
provided along the exterior side of the fence.
Landscaping shall be allowed in the drainage and utility easements covering the 15 foot wide
landscape buffer area in Outlot E and Outlot F.
Environmental Assessment Worksheet (EAW)
As previously noted, in 2006 a mandatory Environmental Assessment Worksheet (EAW) was
prepared for the original Nature’s Refuge concept because the proposed 278 housing units
exceeded the 250 housing unit threshold. The EAW thoroughly analyzed potential impacts to
wetlands, rare plant and animal species, floodplain, water quality, noise, traffic and archeology.
It was determined the project did not have the potential for significant environmental effects
and the Council passed Resolution No. 07-06 making a Negative Declaration on the Need for
an EIS.
The scope and size of the current proposed Nature’s Refuge (61 housing units on 95 gross
acres) is much smaller than the original 2006 proposal (278 housing units on 232 gross acres).
An EAW is not required for the current proposed Nature’s Refuge because the 62 housing units
do not exceed the 250 housing unit threshold.
Traffic Study
The Traffic Study prepared by Spack Consulting on June 4, 2018 based was reviewed during
the PUD Development Stage Plan/Preliminary Plat process. The development is forecasted to
generate approximately 565 new trips per day with 45 new trips in the a.m. peak hour and 60
trips in the p.m. peak hour. Per the traffic study, the existing LOS is C and the 2021 Build LOS
is C. The proposed development meets the subdivision ordinance requirements.
Wetlands
A WCA Notice of Decision for the wetland boundary delineation was approved by RCWD on
June 16, 2016. Seven (7) wetlands were delineated on site totaling 41.66 acres. ACD 32 is not
classified as a wetland.
A revised WCA Permit Application for wetland sequencing and mitigation was prepared by
Kjolhaug Environmental Services on April 5, 2019. The project area is located within in the
RCWD Lino Lakes Comprehensive Wetland Protection and Management Plan (CWPMP) area.
The intent of the CWPMP is to preserve/enhance high-priority wetlands/wetland corridors. Six
(6) of the 7 wetlands are in the Wetland Management Corridor (WMC). The exception is
Wetland 1. Wetland buffer easements covering 14.73 upland acres will protect the WMC.
Wetland impacts will be mitigated through the purchase of wetland bank credits.
In summary, post-development wetland hydrological regime is equal to predevelopment
conditions, wetland water quality is higher overall than pre-development conditions, and
9
wildlife habitat structure improves overall post-development likely due to removal/conversion
of cropland to permanent upland buffer.
Per Sheet W1, Wetland Buffer Exhibit prepared by Carlson McCain revision dated June 15,
2018 and the Kjolhaug Wetland Application revision dated April 5, 2019:
Wetland Summary
Total Delineated Wetlands 41.66 acres
Permanent Wetland Impact 1.7041 acres
Temporary Wetland Impact 1.3148 acres
WMC Buffer Area 14.73 acres
Wetland Bank Credit 2.8408 credit from Brad
Moen bank
The applicant has submitted draft conservation easements over the applicable wetlands.
Rare & Endangered Species
Minnesota endangered and threatened species must be considered when submitting a wetland
replacement plan. A rare plant survey identified portions of three populations of state-
threatened plant species that would be impacted by the development. A Takings Permit
Application has been submitted to the MNDNR for their review and approval. Impacts to this
habitat have been minimized by reducing the road right-of-way width and setback and
relocating the trail to the west side of the development.
Federal endangered species of concern in the region include the northern long-eared bat
(NLEB). Based on the tree species present onsite and the fact that there are no known NLEB
hibernacula or roosting colonies in the project vicinity, negative effects to the NLEB or its
habitat are not expected.
Floodplain
The 2015 DFIRM indicates Zone A floodplain on site, mainly over the easterly wetland
complex and along ACD 32. Per RCWD modeling data, the east floodplain base flood
elevation is 904.5 and the west floodplain elevation is 904.2. Per March 14, 2019 revised Sheet
FP, Floodplain Exhibit, 215 cy of floodplain fill is required related to the Street C/ACD 32
ditch crossing. Proposed floodplain mitigation is 47,700 cy.
A FEMA Conditional Letter of Map Revision (CLOMR) or Letter of Map Revision (LOMR) is
not required because floodplain impacts do not encroach into any single family lots.
Growth Management Policy
10
Per the Comprehensive Plan (page 3-27), an annual average of 230 units per year over each 5
year phasing period not to exceed 345 units in any 1 year is allowed. At the end of the 5 year
phasing period, unallocated units will be averaged out over the next 5 years.
Nature’s Refuge is proposed to be graded and developed in one (1) phase.
Homeowner’s Association (HOA)
A homeowner’s association (HOA) shall be responsible for the ownership and long term
maintenance of the items detailed in Resolution No. 20-81, HOA Declaration and/or
Development Agreement.
Development Agreement
A Development Agreement shall be drafted by the City, executed by the City and the developer
and recorded by the developer.
Title Commitment
The City Attorney reviewed the title commitment and final plat and has the following
comments:
1. The signatory on the plat does not match up with the title work. The plat is drafted to
be signed by Preferred Builders, Inc. The title work shows title in preferred Properties
and Management, LLC, a Wyoming LLC.
2. There is a mortgage on the property reflected in paragraph 18 of Schedule B, Part II.
As the mortgage company is not a signatory, you will need to do the consent you have
done in the past.
Stormwater Maintenance Agreement
Under the City’s and RCWD Programmatic Stormwater Management Facility Maintenance
Agreement, the City will be responsible for maintenance of the stormwater management
facilities related to Pond 100, Pond 400, Infiltration Basin 10, Infiltration Basin 20, ACD 10-
22-32 ditch crossing culvert and outlet structure. RCWD is responsible for maintenance of
ACD 10 -22-32 per a recorded Easement for ditch maintenance. RCWD is requiring a
declaration of stormwater maintenance for Lake 200 and Lake 300 in which the HOA is
responsible for maintenance.
Rice Creek Watershed District (RCWD)
RCWD issued a CAPROC for Permit #17-122 on May 22, 2019.
Findings of Fact
The Findings of Fact for the Rezoning and PUD Development Stage Plan/Preliminary Plat are
detailed in Ordinance No. 05-18 and Resolution No. 18-70, respectively. The Findings of Fact
for the PUD Final Plan/Final Plat are detailed in Resolution No. 20-81.
11
RECOMMENDATION
The Planning & Zoning Board reviewed the PUD Final Plan/Final Plat on July 10, 2019. The
Board recommended approval of the development with a 6-0 vote.
ATTACHMENTS
1. City Engineer Memo dated July 22, 2019
2. Environmental Coordinator Memo dated July 29, 2020
3. Resolution No. 20-81
4. Final Plat
5. Resolution No. 20-82
6. Development Agreement
Building a legacy – your legacy. 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
Mem orandum
To: Katie Larsen, City Planner
From : Diane Hankee PE, City Engineer
Date: July 22, 2019
Re: Nature’s Refuge Final Plat Review
Project No. 011406-000
We have reviewed the Final Plat documents received April 28, 2020 for the Nature’s Refuge
development including:
• Final Utility Plan Set prepared by Carlson McCain
• Final Grading Plan prepared by Carlson McCain
• SWMP rev 6 prepared by Carlson McCain
The following are our review comments that should be responded to in writing by the applicant.
Carlson McCain Responses in Brown 12/20/19
City comments are in blue.
Responses in purple.
Responses in Light Blue 06/06/19
The applicant shall submit an updated Geotechnical Report, SWMP, and RCWD
approval for ACD 10-22-32 realignment, per our comments below.
Engineering
• General
The Nature’s Refuge development includes 95 acres north of CSAH 14 (Main Street),
west of CSAH 23 (Lake Street) and east of Wood Duck Trail. The revised project
proposes 62 single family houses and associated infrastructure. This property was
ori ginally part of a larger development of which an Environmental Assessment
Worksheet (E AW) was prepared. The evaluation concluded that the project did not have
the potential for significant environmental effects. The EAW included a comprehensive
analysis of the area which we incorporated as part of our review for Nature’s Refuge.
The site has relatively flat topograph y, with elevations ranging from 904 to 914. Much of
the site is below 905, which is the approximate elevation of the delineated we tlands on
the site. The geotechnical conditions of the site indicate that there is one foot of topsoil
overlaying glacier outwash including silt y sand and poorly graded sand. Sandy lean clay
was found 29 and 40 feet below grade. The groundwater elevation at the south end of
the site is 904 and 898 at the north end of the site.
1. Street C shall be extended to the north side of Anoka County Ditch (ACD) 10-22-32.
This includes the extension of sanitary sewer and watermain and culvert crossing
reconstruction/extension. The road bed shall be graded and restored for future
extension and pavi ng. Street C extended to the north extents of the property.
2. Sheet 13 (Preliminary Site and Utility Plan) shows an Outlot C in the same locations
as previously identified Outlot B. Outlot lettering updated
3. Each plan sheet should include an accurate legend. Legend updated.
4. This project is assumed to be phased with Blocks 3, 4, & 5 being constructed as
Phase 2.
Noted. 2 phases proposed.
Proposed all as one phase.
Noted, Final plans are shown as one phase.
5. Standa rd Detail Plates from the City of Lino Lakes General Specifications and
Standa rd Detail Plates da ted February 2018 should be used in the “Details”
section of the plans. Contact Ed Young quist at the City of Lino Lakes for PDF
versions. The city detail plates will be added in with final grading plans as well as
final street and utility plans.
City of Lino Lakes 2020 Standard Detail Plates shall be used.
6. Applicant to include pedestrian curb ramps in final plat.
Pedestrian ramps shown in final Utility and Street Construction plans.
• Grading, Erosion and Sedi ment Control
The Na ture’s Refuge development proposes the mass grading of 62 new single-famil y
lots. It includes the extension of streets and utilities northerly from Main Street (CSAH
14). A project SWPPP was submitted and reviewed.
Comments:
1.The applicant shall submit the earthwork volume data for excavation and embankment.
Earthwork balance is attached.
2.The applicant shall ensure that the proposed grading is not in conflict with the
existing elevation south of Street B at the edge of the site.
FES added to catch runoff in the created low area.
3. Label pre-drainage and post-drainage directional flow arrows.
This is shown on the drainage figures in the SWMP.
Drainage arrow need to be shown.
Drainage arrows added.
4. Show locations for stockpiles and BMP measures for stockpile management.
Stockpile locations will be determined by the grading contractor.
BMP measures are detailed in the SWPPP.
5.The applicant shall show a screening berm along Main Street (CSAH 14) and grades
to accommodate a trail, see comments in the transportation section.
A berm is not possible with the drainage swale in the Outlot D. A 15’
landscape easement has been added along B4 L15-17 and a screening fence
along B7 L1.
6. The applicant shall add redundant perimeter control measures spaced 5’ apart
where a 50’ buffer cannot be maintained from wetland or surface water areas.
Areas include the eastern portions near Sta 3+00, Sta 6+50, Sta 7+50, Sta 12+00.
Redundant perimeter silt fence added along entire length of wetland east of
blocks 5 and 6 and east of Street C.
7. The applicant shall review drainage being directed onto adjacent private
property:
• Water from Street B and A is directed to east and may require an easement
from the landowner to drain to the proposed FES.
Grading has been revised. Sidewalk revised to 8 feet and placed against
curb to allow for additional grading to the east.
• West side of L2B8?
Grading has been revised on the west side of L2B8. A FES has been added
and swale elevations added.
Better define/pull back, into the yard from both the north and south, the
swale on the west side of L2B8.
Slope steepened along the driveway to 3:1 to provide a better swale. Easements
revised accordingly.
8. Better define the grading for the future trail along Main St. and edit not to say
“Grade 10’ trail for future construction”. Note sheet 4 of the sanitary profile
does not show the trail cut in please edit.
Future grading shaded back in the exception piece and a note added. Trail to slope
into Main Street where there is curb and slope away where there is none. This may
change when the county decides to expand the street in the future. Note that
correspondence we have received from the county, the road will be expanded, but no
date has been determined yet. Also per conversation with the county, see updated
turn lane layout and slopes from edge of bit to infiltration basin.
• Stormw ater Management
The existing site is undeveloped and has Anoka County Ditch (ACD) 10-22-32 flowing
through the site from east to west. The site also contains several wetlands. The Nature’s
Refuge development proposes a storm sewer and ponding system. The system shall meet
the
City’s and Rice Creek Watershed District’s (RCWD) Stormwater Management
requirements. The total proposed impervious surface is 7.8 acres. They are proposing
that the impervious areas be managed through storm water ponds, infiltration basins and
wetlands and discharging to ACD 10-22-32.
Basin NWL HWL
Pond 100 902.5 905.2
Pond Lake 200
901.5 902.6
Pond Lake 300 902.0 Confirm 902.5
Pond 400 901.8 902.7
Basin 10 N/A 907.3
Wetland C 902.0 903.1
Per the submitted modeling the rate control for the site does not increase. The majority
of the discharge leavi ng the site is through ACD 10-22-32. A CAPROC has been
approved by RCWD for reference.
Noted.
Comments:
2. RCWD is the ditch authorit y for ACD 10-22-32 and is responsible for the
maintenance, function and capacity of the ditch. The City of Lino Lakes would be
responsible for Pond 200 maintenance and function. The ditch, and its associated
rights, extend east and shall not be routed through the pond. The easement will extend
around the north end of the pond to provide RCWD with the access needed. This has
been discussed with the wa tershed. Appli cant shall address water quali ty
calculations, and confirm whether Pond 200 is necessary for water quality
treatment for the impervious surface increase. If the pond is not necessary to
meet water quality treatment, then similar to Pond 300, Pond 200 is
recommended to be private and be maintained by the Home Ow ners Association.
If Pond 200 is necessary for water quality treatme nt, the applicant shall work
with the City as well as the RCWD Ditch Authority . Pond 200 should be 2 cells
separating ACD 10-22-32 into one basin, and the City Pond into a second basin
as needed for water quality.
Pond 200 is not necessary to meet NURP requirements.
Pond 200 and Pond 300 are not necessary to meet NURP requirements and should
be identified as something other than a pond (lake, basin, etc.) and are also
recommended to be maintained by the Homeowners Association.
Designations for Pond 200 and 300 changed to Lake.
3. Pond 300 is not considered a stormwater pond. It doesn’t meet the requirements for
water quality treatment due to the depth. It was not included as part of the water
quality calculations. It is recomme nded that this borrow area should be private
and maintained by the Home Owners Association.. Comment Noted
This shall be called out in the agreement and provided by the developer.
4. The applicant needs to adjust the location of the outlet control structures such that
City can access and maintain. Specific to Pond 200. Access is provided to outlet
control structures.
Access is shown on plans via maintenance bench around pond and bituminous
trails where ponds/lakes are not accessible from the road.
3A. Applicant to confirm that RCWD Ditch Authority to maintain outlets and
culverts within ACD 10-22-32 easement and submit information to the City.
Waiting for verification from RCWD.
RCWD has noted they will not maintain the culvert and outlet.
5.The applicant shall include the 10-day snowmelt event in modeling and update the
proposed 10-da y snowmelt HW Ls on the plans. 10-day snow melt added to the
models and report.
Applicant shall include the modeled 10-day snowmelt HWLs on the plans.
10-day snow melt results are shown on the plans and will be included in the updated
SWMP.
6.The applicant shall confirm the amount of new impervious. There are different
numbers in Section 1.2 and Section 2.5 of the Stormwater Management Plan, Secti on
2.2 of the Stormwater Pollution Pre vention Plan (SWPPP), and the HydroCAD
modeling. New impervious area has been recalculated and confirmed.
Addressed for Stormwater Management Plan and HydroCAD. Applicant shall
update the SWPPP.
SWPPP updated per SWMP updates.
SWMP revision 5 dated 5/13/19 still contains three different net new impervious
surface areas. Applicant has confirmed that the impervious surface reported in
the RCWD CAPROC (8.7 acres) is the correct amount. This aligns with
HydroCAD modeling, and water quality requirements for this amount are being
met. The City recommends the applicant update their SWMP to reflect this
number.
SWMP updated to relate to 8.7 acres of proposed new impervious.
7.See Table C3 in RCWD Rule C: St ormwater Management Plans for maximum
curve numbers for existing conditions and adjust modeling accordingl y. See
section 4b for adjustments to curve numbers for proposed conditions. Curve
numbers changed to match RCWD rules
8.The applicant shall confirm that the names of wetlands match between the existing
conditions map and the existing conditions HydroCAD model. Node IDs are
changed
9.The applicant shall provide the wetland susceptibility class, bounce, and
inundation periods for impacted wetlands. See Table C4 and section 8 in RCWD
Rule C.
None of the wetlands provide retention or significant bounce in existing or proposed
conditions because there is not a we ll-defined storage or outlet component.
The submitted HydroCAD model indicates that wetlands on the site have storage
and outlets. Please provide wetland susceptibility class, bounce, and inundation
periods for impacted wetlands.
Summary will be provided in the updated SWMP. The total bounce in the wetlands is
less than 1 foot for the 100-year rainfall event. The outlets and storage are modeled as
natural overflow weirs with typical undulating bottoms for storage.
Wetland summary not provided in SWMP revision submitted; applicant must
show with final SWMP revision wetland summary requirements noted above are
being met.
SWMP is updated with wetland summary bounce and inundation requirements.
10. The applicant shall refer to Table C5 in RCWD Rule C for soil infiltration rates.
Comment Noted
Applicant shall update infiltration rate in HydroCAD model for IB10 to be
consistent with soil boring and Table C5.
Soil boring SB-2 was placed in the infiltration area. The soil was described as silty
sand overlying coarse-grained sand. This is consistent with an infiltration rate of 0.45.
11.The applicant shall update wa ter quality standards to be consistent with the
requirement to treat 1.1-inches of runoff for new or reconstructed impervious surface
per section 6c of RCWD Rule C. See Table C1 in RCWD Rule C for the TP removal
factor for stormwater ponds and apply as necessary. The applicant shall verify that
the site is meeting water quality treatment standards. Meeting the standards is not
feasible on this site due to the high water table.
The applicant needs to meet water quality standards for the site. Please update
Appendix C to account for the TP removal factor indicated for stormwater
ponds (Table C1 in RCWD Rule C or Table 2 in Lino Lakes Code of
Ordinances Chapter 1011). The applicant shall consider including a water
quality discussion in Section 2 of the Stormwater Management Plan.
Updated TP removals will be included in the updated SWMP
Updated TP not included in the revised Appendix C. Per RCWD CAPROC, water
quality requirements are being met. It is recommended that applicant include a
water quality discussion in section 2.
RCWD has approved this plan. Please verify that the city will require this. All
ponds are designed to NURP standards. All ponds, basin expansions, the addition
of infiltration, and enhancement of wetlands should cover TP requirements. Very
little water is running directly offsite. The majority of the site is running through
at least two of these (if not more) storm water practices.
Total required water quality treatment removal for the 8.7 acres of impervious surface
is being met by volume reduction and NURP ponds. Calculations are found in
Appendix C of the SWMP.
12.The applicant shall verify HWLs for ponds. In some instances, they differ betwee n
the HydroCAD modeling and the plans. HW Ls confirmed.
The applicant shall revise the HWLs on the plans to match HydroCAD
modeling.
Plans are updated.
Applicant shall clarify why two different 100-yr HWL and 10-day Snowmelt
elevations are shown on the plans.
Smaller text shows HydroCAD water levels. Larger text shows water levels provided
by RCWD. Both are shown to compare the two.
13.The applicant shall clarify the intent of the low area on Outlot D. If intended to be
a stormwater pond, please include it in modeling. Node added
14.The applicant shall revise the ACD number it varies throughout the Stormwater
Management Plan and SWPPP narratives. Comment Noted and ditch ID consistent
in report
Addressed in Stormwater Management Plan. Applicant shall update the
SWPPP.
SWPPP updated per the SWMP.
15.The applicant shall verify the lot lines on Lot 12 Block 4, Lot 4 Block 1, and Lot 5
Block 1. It appears the structures may encroach on the drainage and utilit y
easements. Plan updated.
The applicant shall verify the lot lines on Lot 24 Block 7. It appears the
structure may encroach on the drainage and utility easement.
Lot lines revised in this area as well as pad locations.
16.The applicant shall include the bottom elevation of the infiltration basin on the
grading plans. Elevations added.
Applicant shall verify the bottom elevation, as it differs between HydroCAD
model, plans, and Appendix C. Verify the culvert outlet elevation; outlet
should be above the exfiltration elevation. As a note: planting medium is not
necessary below the bottom of the infiltration basin.
The infiltration is not intended to provide above-ground retention to prevent
oversaturating the back yards of the adjacent lots. The area is a flat infiltration
swale area.
The plan and HydroCAD Model now show the outlet elevation equal to the
infiltration basin bottom. Note that with this design, infiltration volume credit
cannot be claimed for IB10 and the SWMP must be updated. Volume of
infiltration is the ponded volume (volume from basin bottom to the outlet
elevation).
Outlet for infiltration basin 10 raised 0.5’ above bottom of basin. Per RCWD
comments, infiltration volumes have been updated.
17.The applicant shall verify the retention volume calculation for Pond 400 in Appendix
C as there appears to be an error. The volumes are correct.
18.If needed, the opportunity may exist to maximize infiltra tion at the infiltration basin
b y constructing the basin to minimize the separation between the bottom of the basin
and the water table. The basin needs minimum 3 feet separation from the water table
and cannot be lowered.
19.The applicant shall verify that the HWL of the Infiltration Basin is 2.0 feet below
the low entry elevations of surrounding buildings. Separation requirement is met
20.The applicant shall display and label emergenc y overflows with spot elevat ions and
drainage arrows at all ponds and sags, specificall y at the intersection of Street A
and Street C and at the cul-de-sac of Street C. EOF’s added.
21. The applicant shall confirm that there is a 10-ft. setback between the HW L of the
infiltration basin and the drainage and utility easements. HW L is covered by
easement.
22. The applicant shall verify that the top berm of stormwater ponds is 2 ft. above the
HW L of the pond. Berm updated.
23.The applicant shall label the safety bench on the plans. It shall be at least 10-ft wide.
The pond slope cannot be greater than a 3:1 slope. Comment noted.
The applicant shall label the safety bench on the plans.
Safety bench label added.
24. The storm sewer system and grading in the rear yards of Lot 1-3 Block 1 should be
evaluated to eliminate the middle structure and provide one EOF. The CB between
Lot1 & 2 should be moved north onto Lot 2 so that it is not on the property li ne. This
is not possible to maintain minimum slopes.
25. The applicant shall update the drainage area characteristics for Pond 100 in
Appendix C. While the calculations appear to be correct, the applicant shall
update all ponds in Appendix C to indicate that 1.1” of runoff is the required
water quality volume for new impervious area.
Included in the updated
SWMP
26. The applicant shall confirm the elevations of the broad crested rectangular weir
outlets of Ponds P200.
Weir elevation updated in the
model
27. The applicant shall verify NWLs (Pond 300, Wetland C) and 100-year HWLs
(Pond 400) in Table 1. Note that infiltration basins do not have NWLs.
Normal water levels verified.
28. It is highly recomme nded (MPCA Stormwater Manual) that pond liners
be installed at wet po nds in A or B soils.
The MPCA stormwater manual recommends a liner for ponds in A or B soil to maintain
permanent pool. The ponds on the development intersect the water table so a liner is
not necessary.
The applicant shall note that proposed water quality ponds are not within a
Source Water Protection Area therefore they are not required to have a liner.
However, it will be the responsibility of the Developer to show that the proposed
dead pool volume can be maintained after construction.
Based on the water levels of the wetlands on-site, the dead pool volumes of the
proposed ponds are assumed to be maintained post construction.
29. The applicant shall confirm that the starting elevations for the HydroCAD
modeled storm pond storage start at the bottom of the pond (and not below).
Specific to Ponds P200.
Pond 200 starts at 901.5 and the v-notch weir is set at 901.5.
30. On the Anoka County ditch system, there shall be consideration for beaver guards
at all surface water structures
Beaver guards will be discussed and confirmed with the ditch authority.
31. The applicant shall provide a design option, in coordination with RCWD, of
culvert 3 that would reduce the susceptibility to being plugged by beavers.
Please verify this is needed or can be something the City takes care of? This is not an
engineering design standard.
The ditch will be maintained by RCWD and Lake 200 will be the responsibility of the
home owners association. If a Beaver prevention devise is used it would installed with the
culvert and to be included in the plans. We will send the engineering information as we
receive it.
Plans updated with Clemson beaver pond leveler.
The applicant shall send the Beaver device to the ditch authority for
approval/acknowledgement.
32. The applicant shall include flumes at the west end of Street C or provide
information as to how the runoff will be maintained on site.
See updated plans. The end of Street C will be directed south to the FES added with this
revision.
• Water Supply
There is an existing 12 inch diameter trunk watermain located along CSAH 14 (Main
Street). The Nature’s Refuge development is proposed to be served by extending 8-inch
diameter DIP watermain from an existing 8-inch diameter DIP watermain stub where
Street A meets Main Street (CSAH 14), and installing 1-inch diameter Type K copper
services. The City’s Comprehensive Plan requires that a 16 inch diameter trunk main be
extended north/south in this area. The proposed watermain extends west and north for
future connection / looping.
Comments:
1.The applicant shall loop the system along the west side of Lot 25 Block 4 from Street
C to Main Street. Watermain loop added.
The watermain on L1B8 shall be located (moved east) under the trail in the
outlot verses in an easement on the west side of the lot.
Watermain relocated under the trail in Outlot E.
2.The applicant shall install 16 inch diameter trunk wa termain from Main Street north
through the development. Along west side of Lot 25 Block 4 and to the north extents
of Street C. Trunk oversizing credits will apply. Watermain sizing updated.
3.Watermain shall be extended north along Street C under ACD 10-22-32.
Watermain extended to the northern property line.
4.16 inch Gate Valves should be added east of Street D and just south of the ditch
crossing.
Valves added
5.The existing hydrant along Main St will need to be relocated for the trail.
The existing hydrant should be moved when the trail along Main Street is installed.
See comments on trail below. Also, by moving the hydrant, their will need to be a
temporary easement provided in the exception piece and will have to be placed at
the right of way line. The installation of the trail and hydrant relocation would be
better constructed when the additional right of way is acquired by the county.
6.Trees should not be planted on top of the watermain (20’ clear above) on Outlot E
and shall be 10-15’ back from the trail.
Landscape plans revised.
• Sanitary Sewer
There is an existing 21 inch diameter trunk sanitary sewer located along CSAH 14 (Main
Street). The Nature’s Refuge development is proposed to be served by extending 8-inch
diameter PVC sanitary sewer throughout the development from an existing sanitary sewer
manhole in Main Street (CSAH 14) just south of Outlot E, and installing 4-inch diameter
Schedule 40 PVC services. The City’s Comprehensive Plan requires that the sanitary
system serves the future lift station and forcemain of Sanitary Sewer Sub-District 2K,
discharging to the northernmost proposed manhole in Street C.
Comments:
1.The applicant shall increase the mainline sanitary sewer in Street C and D to 10
inch diameter at minimum grade 0.28%. Trunk oversizing credits will appl y.
Sanitary sewer sizing updated.
2.The existing sanitary sewer stub at Main St and Street A shall be properly
abandoned and plugged at the Manhole. Note added to abandon.
3.The applicant shall add a note that sanitary services require the contractor to provide
X, Y and Z GPS coordinates of wyes and service ends for future locating
requirements.
This will be noted on final construction plans.
4.The applicant shall add a note that sanitary sewer pipe be installed with a tracer wire. A
tracer wire box shall be provided at the surface for the ends of the sanitary sewer
service tracer wire to provide access to wire ends for future locating requirements.
This will be noted on the final construction plans.
5.Sanitary Sewer shall be extended north along Street C under ACD 10-22-32.
Sanitary sewer extended to the northern propert y line.
6.Sanitary Sewer shall be extended west along Street C from the most westerly manhole
to the same extent as the watermain. Sanitary stub added.
7. L2B8 should call out a cleanout on the sanitary sewer service.
The service has been extended into the lot (to be installed with development).
Cleanouts are shown every 100’
• Transportation
The Na ture’s Refuge subdivision is proposed on the north side of Main Street (CSAH 14)
between Lake Drive (CSAH 23) and 4th Avenue. Acce ss will be from a new street
connection (Street A) to Main Street (CSAH 14). The development will be set for future
extensions to the west, north, and to Lino Lakes Element ary. To improve access control
on Main Street, the City is working with School to remove their west access and connect
to Nature’s Refuge.
A Traffic Study e valuating the Nature’s Refuge development was submitted by Spack
Consulting. The development includes 60 single family homes that are anticipated to
generate approximately 565 new trips per day, 45 new trips in the a.m. peak hour and 60
trips in the p.m. peak hour.
Comments:
1. The Study needs to provide an anal ysis of the existing LOS with and without
the proposed development as outlined in the Section 1001.013(2)(c).
See revised memo from Spack. The revised Traffic Study addressed a
portion of this comment. The Study should also consider what the
impacts are for an interim analysis a year after the development is
completed as well as the no-build conditions without development for
comparison.
The May 17, 2018 revised Traffic Study addressed a portion of this comment: on page
5 for the planning level screening analysis b y including the 2015 no-build analysis.
Howe ver, an interim year was not considered to address when improvements with a two
lane facility may be need prior to the 4 lane facility being constructed. In addition,
the Intersection Anal ysis on page 7 and 8 did not include the 2015 no-build or interim
year analysis.
Following discussions with the developers engineer an updated revised Traffic Study
dated June 4, 2018 was prepared to address the remaining portion of the comment. The
Stud y now includes the analysis of the interim 2021 conditions with the proposed
development with existing geometric conditions.
Noted per comment above.
2.Projected traffic from any future phases of development (extension of Street B, Street
C, and Lino Lakes Elementary) that would use Street A to access Main Street (CSAH
14) should be included in the analysis. See revised memo from Spack.
3.It is anticipated that Street A would require designated turn lanes at Main Street.
The Study should evaluate the intersection of the new Site Ac cess Street (Street A)
and Main Street (CSAH 14) for both safety and operations. It is anticipated that
Anoka Count y Highwa y Department will require right and left turn lanes on CSAH
14 (Main Street). The turn lane construction shall be add throughout the preliminary
plat documents.
Turn lanes denoted throughout the plans. Detailed turn lane construction plans will
be part of the final construction plans.
Turn lane construction plans shall be submitted.
Turn lane plans attached.
Plans submitted to Anoka County for review. The curb should extend from the
east into the development? Looking at street plans and turn lane plans there
would be a gap in the curb. Applicant to detail how the curb will drain and the
ditch for the turn lanes. Generally, how is the drainage from the turn lanes
being accommodated?
Plans have been revised and submitted to the county – Per discussion with the
county, drainage across the intersection is ok. A 20-scale blow-up of the
intersection with regards to drainage can be found on sheet T2. Curb to wrap into
the site on the east side of the entrance and be removed on the west to match
existing drainage patterns.
4. Upgrading Main Street (CSAH 14) to a 4-lane roadway has been identified by both
Anoka Count y and the City for some time in the future but has not been programed.
Therefore, should the analysis show that existing conditions do not require
improvements at Street A and Main Street (CSAH 14), documentation should be
provided of when in the future with the existing lane configurations the
improvements would be needed. See revised memo from Spack.
5.Assuming that the intersection of Main Street (CSAH 14) and Lake Drive (CSAH 23)
will be addre ssed in the future, no further analysis over what is included in the current
Traffic Study would be required. Comment noted.
6. Street A and Street C shall be 32 feet wide from face of curb to face of curb. The
plans current l y show back of curb. As discussed, 32’ back to back is acceptable.
7.The cul-du-sac widths can be reduced to 28 feet wide from face of curb to face of curb.
Cul-de-sacs have been updated to 28’ back to back. As discussed, 28’ back
to back is acceptable.
Cul-de-sacs shall be 30’ back to back.
Cul-de-sac widths updated to 30’ back to back.
8.The ACD 10-22-32 crossing shall be wide enough to accommodate the road, a 5
foot buffer and an 8.5 foot wide trail with 4:1 side slope tapers.
Ditch crossing updated. Street C extended to the northern property line.
9.The future trail extension along 10-22-32 should be relocated to the same crossing
as Street C. Thus there would only be one ditch crossing.
Ditch crossing updated.
10.There is a future trail planned along the north side of Main Street. The plans
shall include the grading for this trail. This will likely also require hydrant
relocation.
Grading for a future trail has been incorporated. Hydrants will be relocated at the
time of trail construction.
The trail should be constructed from L2B8 to Street A.
From a quick review at this area, the proposed trail is set 8 feet behind the
proposed curb line. In order to construct the trail, there will need to be
approximately a 10 to 15 foot grading easement in the exception piece. The trail
would be better constructed when the county is able to acquire this portion of
right of way.
Staff agrees additional right of way or easement would be needed.
Noted.
11.The applicant shall remove the trees identified in the Landscaping Plan from the
sight line triangle of Street A and Main Street (CSAH) 14. Revised per city
comments.
12.Trees at the intersection of Street A & C should be moved from the site lines.
Landscape plans revised.
13.A bituminous trail is recommended through this site. As noted in the we tland section
of this report the proposed location, along Lots 1-6 Block 3, is within the 25 foot
buffer and should be relocated. The proposed trail location is allowed by RCWD
rules and will therefore not be relocated. According to RCWD Rule F 6(e)(7)(iii) –
Buffer may enclose a linear surface for non-motorized travel no more than 10 feet in
width. The linear surface must be at least 25 feet from the wetland edge. The area of
the linear surface will not be eligible for replacement credit. For projects proposing
non- motorized travel no more than 10 feet in width, the linear surface may be
reduced to less than 25 feet from the wetland edge based on compelling need and a
TEP recommendation to the District in support that the wetland protection afforded is
reasonable given the circumstances. Per Kjolhaug Environmental Services.
14.The proposed sidewalks were reviewed. Pedestrian curb ramps will be required,
and reviewed with the final construction plans. Comment noted.
15.Street C temporary cul du sac should have continual curb and gutter and
temporary paved eyebrows. The storm sewer will need to be adjusted.
Temporary cul-de-sac and storm sewer has been updated.
16. The Revised Traffic Study provided a summary of the Level of Service for each
intersection movement for CSAH 14 and Street A. It concludes that in the build
2030 and build 2030+ conditions the southbound left turn would operate at a LOS
F. Are the recommended improvements discussed on page 9 of the Study included
with the build analysis? If not, what is the change in Level of Service with these
improvements? What is the Level of Service for the interim year (see comment
#1)? What is the Level of Service in the no-build condition?
This comment was not addressed in the May 17, 2018 revised Traffic Study. Following
discussion with the developers engineer an updated revised Traffic Study, dated J une
4, 2018 was prepared which did address the comment. The Study concluded that a
southbound right turn lane would be needed at the CSAH 14 and Street A intersection.
It appears the preliminary plat roadwa y width accommodates this and should be
verified with the final plat (striping plan).
Noted per comment above.
17. The applicant shall move the trail crossing to the intersection of Street C and Street
E.
Trail crossing updated.
Ped crossing signs and striping should be added.
Noted. Pedestrian signs and striping will be added in final plans. Striping added on
site plans.
18. The applicant shall widen the sidewalk in front of Block 8, Lot 1 to 8.5 feet between
the trail connections.
Trail in front of Lot 1, Block 8 updated.
L1B8 shall be 8.5’ wide concrete sidewalk vs trail.
Revised to concrete.
19. The applicant shall show striped crosswalks for the trail crossings with the final
plat.
Crosswalk markings added.
Please add to the intersection of Street C and Street E.
Striping added to preliminary and final plans.
20. Applicant shall adjust slopes on the back side of the trail to be a 4:1 specifically at
the ACD 10-22-32 ditch crossing. This may require extending the culvert length.
Side slopes of trail checked, and are proposed at 4:1 slope.
21. The applicant should install a fence or guardrail on the east side of the trail near
Sta. 8+25.
Fence/Guardrail to be installed.
22. It is suggested that the applicant move the trail crossing near Sta. 8+25 to the
south, away from the ditch crossing. Note: the low point location would be adjusted
so that the catch basins do not interfere with the pedestrian ramps.
Trail crossing unable to be moved.
23. Street lights shall be shown on the plans.
Street lights have been added to final signing and striping plans.
There should be a street light at the intersection of Street A and Main Street. The
light at Street B could be moved and mid-block light location adjusted.
Street lights adjusted.
24. The roadway typical sections shall include the city’s standard 2’ of subgrade
replacement. The geotechnical report does not specifically identify that the in
place material meets the subgrade specifications.
Detail revised to show 2’ subgrade replacement.
8” of Class 5 and 2’ of Select Granular required. Please edit detail.
Revised streets sections to newer details. Note that 6” of class 5 and an approved
subgrade are shown. See response received below from Paul Gionfriddo with Haugo
regarding the subgrade section.
The soils encountered in the borings are predominantly poorly graded sand poorly,
graded sand with silt or silty sand which correspond to the ASTM Classification SP, SP-
SM and SM, respectively. Soils meeting the ASTM Classifications SP or SP-SM have P-
200 contents less than 12 % and soil meeting MN/DOT specifications for Select
Granular Borrow must have P-200 content less than 12%. The on-site soils Classified
as SP or SP-SM already meet the MN/DOT requirement for select granular. This is
generally discussed in the Pavement Section (Section 4.11) in the geo report and we
recommended using an R-Value of 50 for pavement design.
Paul Gionfriddo
HGTS
612-271-8185
Please update standard detail plates to be 2020.
• Wetlands and Mitigation Plan
The Na ture’s Refuge development site includes 7 wetlands on 41.55 acre s as outlined in
the WCA Notice of Decision approved b y RCWD. The plan proposes to fill 2 acres of
wetlands, some of whi ch are denoted as “high priority wetlands” in the cit y’s
Comprehensive Plan. A wetland sequencing application wa s submitted by Kjolhaug
Envi ronmental Services to RCWD on January 8, 2018 and is currently incomplete.
Approval of a complete sequencing application and submittal and approval of a wetland
replacement plan will be required prior to issuance of a grading permit.
Wetlands are being reviewed by the Environmental Coordinator.
Noted.
Wetlands on the project are located within the Wetland Management Corridor and will
require mitigation as noted in Rice Creek Watershed District’s Rule F (Wetland
Alteration), Section 6(b). Wetland 1 is not located within the WMC. All other wetlands
are located within the WMC. Per Kjolhaug Environmental Services.
1. An average 50-foot buffer (25-foot minimum) will be required around all wetland
areas following construction. It does not appear that the proposed buffers meet the
minimum buffer requi rement in all locations.
In an effort to minimize impacts to wetlands yet meet project purpose and need,
proposed WMC buffer does not meet minimum requireme nts along some areas
of proposed wetland fill. A variance application for these areas will be
submitted to RCWD for review with the revised Wetland Permit. Per Kjolhaug
Environmental Services.
2. A 10-foot bituminous trail is proposed within the upland buffer adjacent to the wetland
in Outlot B. This trail must maintain 25-feet from the edge of the we tland. The City’s
Environmental Coordinator is reviewing the wetland buffer areas.
Noted.
3. Two deep (30+ foot deep) ponds (Pond 200 and Pond 300) are proposed adjacent to
wetlands within the project. The adjacent wetlands are denoted as “high priority
wetlands” in the city’s Comprehensive Plan and are noted as having exceptional
vegetative diversity. The applicant shall take steps to ensure that the ponds will not
drain the adjacent wetland areas. In the WCA Wetland Replacement Plan, the
developer shall provide a plan to protect adjacent wetlands, the plan shall also include a
mitigation plan if the wetlands are impacted post construction.
With regards to pond construction and potential drainage effects on adjacent wetlands:
• Pond 300 in the northeast portion of the development area will be a maximum of 22
feet deep, has a predicted NWL of 902-ft, and has no outlet (no outlet structure or
emergency overflow). In reality, the open water portion of Pond 200 will be the
elevation of the local water table and will vary throughout the year as the water table
does because the pond does not have a controlled outlet to stabilize water levels.
Because the pond does not have an outlet to drawn water down, it will not drain
nearby wetlands (there is no where to drain the water if there is no outlet). For these
reasons, drainage effects to Wetlands 3, 3a, or 3b from Pond 200 construction are not
expected to occur. A similar pond with no outlet was constructed onsite sometime after
1991 near the proposed wetland banking wetland. That large, deep, open-water pond
was excavated adjacent to wetland and has
not resulted in wetland drainage.
• Pond 200 will be excavated in around the west end of ACD 10-22-32 (west of the
current ditch crossing). The ditch currently drains freely to the west (no controlled
outlet). Water levels in the ditch were measured at 901.5-feet by the engineer.
Therefore, newly constructed Pond 200 will have an OSC with V notch weir invert of
901.5-ft with the top of the weir at 902.5-ft. The adjacent wetland the southeast
(Wetland 2) will have a NWL of 902.0-ft, and will have a raised outlet (EOF only) at
902.5-ft. Wetland 2 will need to be inundated with over 6 inches of water to outlet to
Pond 200. That occurrence alone, usually occurring early in the growing season, will
meet wetland hydrology requirements. For the remainder of the growing season, Pond
200 and adjacent Wetland 2 water levels will fluctuate with precipitation events and
normal seasonal water table level variations. For these reasons, drainage effects to
Wetland 2 from Pond 200 construction are not expected to occur.
• Wetland 4 to the northwest of Pond 200 will not have an outlet, will not be connected
to Pond 200, and will be physically separated by the pond maintenance bench/berm.
For these reasons, drainage effects to Wetland 4 from Pond 200 construction are not
expected to occur.
• The current and proposed ditch crossing culvert invert elevations and size are equal
pre and post development. Therefore, drainage effects to upstream wetlands are not
expected to occur.
Per Kjolhaug Environmental Services
Appli cant is submitting a geotechnical report addressing the existing wetland &
soil conditions and present any proposals to protect the adjacent wetlands as
needed. See attached Wetland permit application. Geotechnical report to be submitted
when received.
4.A review of the DNR’s Natural Heritage Information System (NHIS) Database
revealed that rare fea tures have been recorded in or near the wetlands on the property.
In 2002, toothcup (Rotala ramosior), a state threatened species, was located within
one wetland that is proposed to be filled. Autumn fimbry (Fimbristylis autumnalis)
and Blanding’s turtle (Emydoidea blandingii) have also been recorded near the
project site. The developer will need to coordinate with the DNR to obt ain a permit
for the take (destroy, dig up, dispose of, possess, or transport) of threatened or
endangered species.
MnRAM guidance and the 2017 Native Plant Communities Assessment Final
Report prepared by CCE S have been reviewed. Based on this review and for
WCA/RCWD purposes, vegetation quality for all wetlands onsite was
determined to be low, with an associated RCWD wetland degradation status of
marginally to severely degraded. Specifically: (1) rare plants found onsite are
not persistent and therefore item i of the special features tab in MnRAM does not
apply and vegetation quality is Low, and (2) although the Native Plant
Communities Assessment Final Report identified rare species onsite, the report
also states that (paraphrasing) “these rare species were located within areas
dominated by crops or agricultural weeds. While state-listed species do occur
within cropland and farmed wetland
areas, their presence alone is not enough to classify these areas as native plant
communities or rare native plant communities.” Rare plants were primarily
found in disturbed, annually farmed wetland fringe areas. Per Kjolhaug
Environmental Services.
5.The ghost plat shown in Outlot B on the north end of the project (Sheet 10) appears to
propose future wetland impacts. These impacts should be taken into account during
the sequencing efforts discussed by the Wetland Conservation Act Technical
Evaluation Panel. Road alignments should be considered that would minimize future
wetland impacts. The ghost plat is now shown to be proposed and has been
modified to prevent wetland impacts.
A permit to take has been submitted to DNR by CCES for all rare species
located in the development footprint (areas that will be physically
altered/graded/converted to another use). It is important to note that the
presence of rare species onsite is largely a function annual soil
disturbance/farming practices. Once farming practices on the site cease
(with or without development), rare species occurrence on the site is
predicted to drop. Per Kjolhaug Environme ntal Services.
• Geotechnical
A geotechnical evaluation was completed in response to the concerns over draining the
adjacent Pin Oak wetland and impacts to adjacent wells.
1. The introductory paragraph and overall report shall provide recommendations for not
only “dewatering” but also reference the” large borrow areas (Ponds 200 & 300)
adjacent to existing wetlands”.
To be provided with updated Ge o report.
2. The applicant shall provide a map of identifyin g the location and quantity of
piezometers and another map of auger probes.
To be provided with updated Ge o report.
3. The applicant shall provide an evaluation of subsurface geologic feature mapping that
can suspend water, or drain with the ground water flow in the absence of geologic
“lens”. The Minnesota Ge ologic surve y would be a good reference and soil
augerings, mentioned above, to verify lens or no lens.
To be provided with updated Ge o report.
4. The applicant shall provide a document specifically outline the plan to address well
impacts and a plan to address wetland impacts that may occur as a result of this
development. The plan may include items sugge sted in geotechnical memo, clay
berms and clay lining of the borrow areas.
To be provided with updated Ge o report.
5. We recommend that the City, through the Development Agreement, require securities
for mitigation costs associated with protecting the adjacent Pin Oak we tland and
adjacent wells.
Noted.
Wetlands are being reviewed by the Environmental Coordinator.
Noted.
• Floodplain
The floodplain within the Nature’s Refuge development is a Zone A. The 2015 DFIRM
base flood elevation (BFE) from RCWD modeling identifies the BE F elevations of 904.5
(easterly floodplain) and 904.2 (westerly floodplain). The applicant is proposing to fill 37
cubic yards of floodplain and mitigat e onsite. There are 29,533 cubic yards of floodplain
mitigation proposed on site.
1. Floodplain impacts are proposed on site due to stormwater ponding and structures,
and Lots 4-5 Block 3. A LOMR will be required. The applicant shall provide a
copy of the CLOMR application to the City. The LOMR is to be in place prior to
final plat.
This is not required as the floodplain boundary does not encroach any of the lots.
Noted.
The applicant is not proposing FEMA floodplain changes at this time.
• Drainage and Utility Easements
The municipal infrastructure proposed with the Nature’s Refuge Preliminary Plat is
generally within public right of way, easements and outlot.
1. Anoka Count y requires 75 foot right of way be dedicated along Main Street (CSAH
14).
Right of wa y updated along Main Street.
75 feet of right of way provided.
2.The right of way shown i n the Ghost Plat shall be dedicated with the Plat.
Ghost plat is now shown to be proposed.
3.Street A, at Main Street (CSAH 14), will require turn lanes and thus additional right
of way. Turn lanes added. No further Right of Wa y required.
4.Lot 25 Block 1 shall have a 20 foot drainage and utilit y easement for watermain
looped connection. Easement added.
5.Lot 5 Block 1 shall be chamfe red at the northeast corner to accommodate future
access to Pond 100. Plan updated and access path added.
6.Bituminous trails shall be within 25 foot easements if not within right of way or outlot.
Bituminous trail is only proposed in right of way or an outlot.
Trail easements should be dedicated.
Trail easements will be provided with separate document. Ownership of
Outlots also to be determined.
• Development Agreement
A development agreement will be required with the final plat.
Comment noted.
• Grading Agreement
Not applicable at this time.
Comment noted.
• Stormw ater Maintenance Agreeme nt
A Stormwater Maintenance agreement will be required with the final pl at.
Comment noted.
Per RCWD CAPROC (5-22-2019; Permit 17-122), the applicant will be
responsible for submitting a maintenance agreement to the District, under
which the applicant will be responsible for maintaining pond and crossings of
the public drainage system (ACD 10-22-32) to ensure drainage function is
maintained. The storm sewer system and treatment ponds may be covered
under the City’s programmatic agreement.
The maintenance agreement to be coordinated with the owner.
In Process with owner.
A draft Declaration for Stormwater Management should be submitted for
review. Where RCWD is referenced the City should be added. A figure to
identify City maintained verses HOA maintained should be submitted.
• Permits Required
The following permits shall be obtained prior to the issuance of a grading permit.
Comment noted. Permits will be obtained. Permits #3 & #4 will be obtained
prior to final utility construction.
The applicant should identify the status of permits below.
Comments:
1. NPDES Construction Ge neral Permit
2. City of Lino Lakes Zoning Permit for Grading
3. Minnesota Department of Health Watermain Extension Permit
4. MPCA Sanitary Sewer Extension Permit
5. Anoka Count y Permit for Work Within the ROW
6. Rice Creek Watershed Permit for Erosion and Sediment Control
7. Rice Creek Watershed Permit for Wetland Alteration
8. Rice Creek Watershed Permit for Stormwa ter Management (Rule C)
9. Rice Creek Watershed Permit for Floodplain Alteration (Rule E)
10. Rice Creek Watershed Permit for ACD 10-22-32 Alteration
11. FE MA Letter of Map Revision
12. DNR Permit for the Take or Endangered or Threatened Species Incidental
to a Development Project.
13. DNR Water Appropriations Permit (for Construction Dewatering)
• US Army Corps of Engineers Section 404 Permit
If you or the applicant has any questions regarding these comments, please contact Diane
Ha nkee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us.
Page 1
Memo
To: Katie Larsen
From: Andy Nelson
Date: July 29, 2020
Re: Environmental Coordinator Comments
Environmental has the following comments about Nature’s Refuge:
• Tree protection fence shall be installed then approved by the City Forester
prior to any construction activities occurring on the site.
Tree protection fence should appear on the Tree Preservation Plan; Grading,
Development, and Erosion Control Plans at the correct dimensions (one foot
radius from trunk per inch diameter at breast height) as called for in the
Details Plate.
• Update Planting Notes on Site Landscape Plan to match Details Plate on tree
protection fence specifications. Tree protection fence should be installed at
one foot radius from trunk per inch diameter at breast height (DBH) for all
existing trees to be saved.
• Trees in Open Space areas and around storm water ponds should be fire-
resistant species, such as oaks, to allow for future maintenance with
prescribed fire. Replace trees that are not fire-tolerant with oaks.
Environmental
1
CITY OF LINO LAKES
RESOLUTION NO. 20-81
RESOLUTION APPROVING THE PUD FINAL PLAN/FINAL PLAT
FOR NATURE’S REFUGE
WHEREAS, the City received an application for Nature’s Refuge PUD Final Plan/Final
Plat approval hereafter referred to as Development; and
WHEREAS, City staff has completed a review of the proposed Development based on
the following plans and information:
• Sanitary Sewer, Watermain, Storm Sewer and Street Construction Plans prepared
by Carlson McCain dated January 16, 2020
• Grading, Development & Erosion Control Plans prepared by Carlson McCain
dated March 6, 2020
• Preliminary Plan Set prepared by Carlson McCain dated June 12, 2019
• Stormwater Management Plan prepared by Carlson McCain dated June 7, 2019
• Net Area Exhibit prepared by Carlson McCain dated June 12, 2019
• Site Landscape Plan prepared by Carlson McCain dated June 27, 2019
• Final plat prepared by Carlson McCain received April 28, 2020; and
WHEREAS, the City Council the approved the PUD Development Stage
Plan/Preliminary Plat with Resolution No. 18-70 on June 25, 2018; and
WHEREAS, the Planning & Zoning Board reviewed and recommended approval of the
Development on July 10, 2019; and
WHEREAS, the proposed Development is not considered premature and meets the
performance standards of the subdivision and zoning ordinance; and
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino
Lakes hereby makes the following:
FINDINGS OF FACT
1. The final plat substantially conforms to the approved preliminary plat subject to the
conditions listed below.
2. The City Attorney reviewed the status of title/property ownership related to the
final plat and has comments as noted below.
3. A Development Agreement has been drafted and shall be executed.
4. Conditions attached to approval of the preliminary plat have been fulfilled or
secured by the Development Agreement.
5. All fees, charges and escrow related to the preliminary or final plat have been paid
in full.
2
BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby
approves Nature’s Refuge PUD Final Plan/Final Plat subject to the following conditions:
1. Outlots A thru F shall be owned and maintained by a Homeowner’s Association
(HOA).
a. The developer is responsible for the installation and establishment of
landscaping and fences.
b. The HOA i s responsible for the long term maintenance of landscaping and
fences except for boulevard trees. The City shall install and maintain
boulevard trees.
2. Outlots A, B and D are protected by a recorded Easement (Conservation) and
Declaration (Wetland Buffer).
a. The developer is responsible for the installation and establishment of
landscaping and vegetation per Attachment B of the Declaration.
b. The City shall inspect and accept such landscaping and vegetation.
c. The HOA is responsible for the long term maintenance of the landscaping,
vegetation and wetland monument signs.
3. Outlot G shall be deeded to 801 Main Street and the two (2) parcels shall be
combined.
4. Per the City’s Programmatic Stormwater Management Facility Maintenance
Agreement with RCWD, the City will be responsible for maintenance of Pond
100, Pond 400, Infiltration Basin 10 and Infiltration Basin 20. ACD 10-22-32
ditch crossing/culvert will also be maintained by the City under a separate
maintenance agreement. Lake 200 and Lake 300 are being excavated by the
developer for material fill on site and shall be maintained by the HOA and
covered by a declaration of stormwater maintenance. RCWD will continue to
maintain ACD 10-22-32.
5. A Permanent Trail easement shall be recorded over the trail corridor.
a. The developer is responsible for the installation of the trail.
b. The City is responsible for long term maintenance of the trail.
6. The existing pole barn and garage near 635 Main Street shall be removed prior to
issuance of a grading permit.
i. A demolition permit is required.
7. The existing gravel driveway access onto CSAH 14 (Main Street) shall be
removed with the issuance of a grading permit.
8. Resolution No. 18-70 approving the PUD Development Stage Plan/Preliminary
Plat provided the following flexibilities:
a. Reduced minor collector road right-of-way width from 80 feet to 60 feet
on Glenwood Street and Haywood Drive.
b. Reduced front setback from 40 feet to 30 feet on Glenwood Street and
Haywood Drive.
c. Reduced paved road surface width from 32 feet to 30 feet (back to back)
on cul de sac Hazelwood Court and cul de sac Elwood Court.
9. The regulations and performance standards of the R-1, Single Family Residential
zoning district will be in effect unless otherwise detailed in Council resolution or
Development Agreement.
3
BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby
approves the Development subject to the following items being addressed prior to release
of final plat mylars:
1. The Development Agreement shall be approved by the City Council, executed
and recorded against the property.
2. Any staff comments requiring revisions to the final plat.
3. The final plat and title commitment shall be updated to address the following:
a. The signatory on the plat does not match up with the title work. The plat is
drafted to be signed by Preferred Builders, Inc. The title work shows title
in preferred Properties and Management, LLC, a Wyoming LLC.
b. There is a mortgage on the property reflected in paragraph 18 of Schedule
B, Part II. As the mortgage company is not a signatory, consent is
required.
4. The applicant shall prepare the deeds for Outlots A thru G for City review and
approval.
5. Draft copies of the applicable Homeowner’s Association (HOA) documents shall
be submitted to the City for review and approval prior to recording including but
not limited to the following:
a. Articles of Incorporation
b. Bylaws
c. Declaration of Covenants, Conditions and Restrictions
6. Draft copies of Easement and Declaration related to the wetlands and buffers shall
be revised to include the City of Lino Lakes and shall be submitted to the City for
review and approval.
BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby
approves the Development subject to the following items being addressed prior to
issuance of grading permit:
1. All comments from the City Engineer Memo dated July 22, 2020 shall be
addressed.
2. All comments from Environmental Coordinator Memo dated July 29, 2020 shall
be addressed.
3. A copy of the following recorded documents shall be submitted to the City:
a. Homeowner’s Association (HOA) documents
b. Deeds for Outlots A-G
c. Permanent Trail Easement
d. Easement and Declaration related to the wetlands and buffer
e. Development Agreement
4. Proof that Outlot G and 801 Main Street have been combined shall be submitted
to the City.
5. Sheet 2, Preliminary Plat:
a. Net Density shall be revised to 1.68 lots per acre.
b. Wetland Buffer shall be revised to14.73 acres.
c. Street names shall be included.
4
Adopted by the Council of the City of Lino Lakes this 10th day of August, 2020.
The motion for the adoption of the foregoing resolution was introduced by Council
Member
_______________and was duly seconded by Council Member ________________ and
upon vote being taken thereon, the following voted in favor thereof:
The following voted against same:
______________________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
CITY OF LINO LAKES
RESOLUTION NO. 20-82
RESOLUTION APPROVING DEVELOPMENT AGREEMENT
FOR NATURE’S REFUGE
WHEREAS, the City Council approved the Final Plat for Nature’s Refuge with Resolution No.
20-81 on August 10, 2020; and
WHEREAS, the City’s subdivision ordinance and conditions of approval require the execution
of a development agreement between the Developer and the City of Lino Lakes.
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes
hereby approves the Development Agreement between Preferred Builders, Inc. and the City of
Lino Lakes for Nature’s Refuge and authorizes the Mayor and City Clerk to execute such
agreement on behalf of the City.
Adopted by the Council of the City of Lino Lakes this 10th day of August, 2020.
The motion for the adoption of the foregoing resolution was introduced by Council Member
_______________and was duly seconded by Council Member ________________ and upon
vote being taken thereon, the following voted in favor thereof:
The following voted against same:
_______________________________
Rob Rafferty, Mayor
ATTEST:
________________________
Julianne Bartell, City Clerk
WS – Item 2
WORK SESSION STAFF REPORT
Work Session Item No. 2
Date: August 3, 2020
To: City Council
From: Michael Grochala, Community Development Director
Re: Birch Street (CSAH 34) Landscaping Improvements
Background
Anoka County is proceeding with final design of the Birch Street reconstruction project.
The City Council directed staff to prepare some basic landscaping options for the two
proposed roundabouts. WSB and Associates have drafted a couple options available for
consideration. Each roundabout shows a basic concept and an enhanced design.
Basic Design:
• Includes low grow fescue. This turf can sometimes be difficult to establish,
depending on soil types and weather conditions. Once established, it will only
need to be mowed 2-3 times a year and requires minimal watering.
• The center has a Mugo pine shrub surrounded by three trees, which can either be
pine trees or a Hawthorn tree, which is smaller and has a wide horizontal
branching pattern. Karl Foerster grass ornamental groupings are located in
between so that the island will have appeal during winter as well.
Enhanced Design:
• Swaths of larger river rock mulch so that it only needs some spraying for weeds
for less maintenance.
• Smaller swaths of mass perennial plantings between the rock mulch for more
summer color. One swath is the yellow daylily and the other catmint, which is a
deep purple color. Both are very tolerant of high stress locations.
General Notes: The plants selected will handle harsh conditions typical of a median and
still survive.
The Public Service department is reviewing the options from a maintenance standpoint
and staff will provide any comments received at the work session.
Requested Council Direction
Staff is requesting council direction regarding landscaping design.
Attachments
1. Roundabout landscaping examples
K:\016591-000\Graphics\016591_Lino Lakes_Concept PlansLino Lakes, Minnesota
July 24, 2020 | WSB Project number: 016591-000 Scale in Feet
20’0’10’
Lino Lakes Birch Street - Roundbout 1
WOOD MULCH BORDER
CONCRETE PAVEMENT
CENTER ISLAND
- (3) PINES OR
HAWTHORN TREES
- MUGO PINE IN CENTER
- KARL FOERSTER
GROUPINGS
RIVER ROCK MULCH
DAYLILY GROUPING
CATMINT GROUPING
BASIC DESIGN
ENHANCED DESIGN
LOW GROW FESCUE
BASIC DESIGN ENHANCED DESIGN
PONDEROSA PINE OR HAWTHORN MUGO PINE KARL FOERSTER CATMINT YELLOW DAYLILY
K:\016591-000\Graphics\016591_Lino Lakes_Concept PlansLino Lakes, Minnesota
July 24, 2020 | WSB Project number: 016591-000 Scale in Feet
20’0’10’Lino Lakes Birch Street - Roundabout 2
WOOD MULCH BORDER
CONCRETE PAVEMENT
CENTER ISLAND
- (3) PINES OR
HAWTHORN TREES
- MUGO PINE IN CENTER
- KARL FOERSTER
GROUPINGS
RIVER ROCK MULCH
DAYLILY GROUPING
CATMINT GROUPING
BASIC DESIGN
ENHANCED DESIGN
LOW GROW FESCUE
BASIC DESIGN ENHANCED DESIGN
PONDEROSA PINE OR HAWTHORN MUGO PINE KARL FOERSTER CATMINT YELLOW DAYLILY
WS – Item #3
WORK SESSION STAFF REPORT
Work Session Item
Date: August 3, 2020
To: City Council
From: John Swenson, Public Safety Director
Re: CARES Act Funded Proposed Expenditures
Background
As discussed with Council at the meeting on July 27, 2020, staff is working to identify
projects and purchases that serve public purpose and are complaint with the CARES Act
funding eligibility requirements. As you know procurements and projects must be
completed no later than November 15, 2020 which has created a tight timeline.
Staff has reviewed the below projects/procurements and determined that they meet the
eligibility requirements (necessary expenditures due to COVID-19, not accounted for in
the most recently adopted budget, expenditures will be incurred during the covered
period of March 1 to November 15, 2020) and is recommending moving forward with
them utilizing CARES Act funding.
1. Fire Station #1 Remodel – The kitchen area at fire station #1 would be remodeled
and expanded to accommodate social distancing, which is not possible with the
current configuration. The total cost for this project will be $66,128. Please note
that approximately $6,500 of this does not qualify for CARES Act funding, but
funding will be provided through the Bldg and Facilities Fund.
2. Public Safety mobile computer update – Purchase three laptop computers, eight
Toughbook laptop computers, and all needed peripherals (docking stations, port
replicators, monitors). The total cost for this purchase will be $34,369. This
purchase will provide for teleworking capabilities in the Public Safety
Department.
3. LiveScan fingerprinting machine – Due to Covid-19 related restrictions and social
distancing requirements we have suspended the service of fingerprinting residents
for civil matters (adoption applications, employment backgrounds, etc.). The
purchase of this LiveScan machine would enable staff to resume offering this
service to residents. The total cost for this purchase will $30,000.
Attachments
Fire Station #1 Remodel Proposal
LiveScan Proposal
ONE VISION. ONE MISSION. LINO LAKES PUBLIC SAFETY DEPARTMENT.
Lino Lakes Public
Safety Department
Memo
DATE: July 20, 2020
TO: John Swenson, Public Safety Director
FROM: Daniel L’Allier, Deputy Director Public Safety - Fire Division
RE: Kitchen and Break Area Remodel
Last year we started to work towards updating facilities at Fire Station 1. This was a very large
project and due to the cost, some of this work was pushed off to the 2020 budget cycle. The work
that did not get completed under the 2019 budget cycle is updating the kitchen facilities at Fire
Station 1. I am proposing that we move forward with completing these projects.
The current kitchen is a hallway, it is very narrow and lacks space to prepare food. The current
kitchen is 27 years old and the cabinet doors and drawer fronts are failing off the cabinets (Please
see the attached photos).
I have included a drawing of the kitchen space. The total for this project is $36,000.00 and will
include all demolition and construction, new cabinets and appliances for the kitchen.
By completing this project, it will greatly improve the utilization of the training room at Fire
Station 1. With upgrading appliances with modern and more energy efficient equipment, it will
provide the city with a reliable and cost saving option.
Update: February 2020
I met with the General Contractor (Severson Construction) and the subcontractors before starting
the kitchen remodel project at fire station 1 to verify their estimates had not changed and that we
still would have enough money available in the budget to complete the project. After receiving
the update, the estimated cost had increased to $51698.00.
The Covid -19 Pandemic arrived and this project was placed on hold.
ONE VISION. ONE MISSION. LINO LAKES PUBLIC SAFETY DEPARTMENT.
Update: June 2020
I again met with the General Contractor (Severson Construction) and the cost increased to
$58298.00. I invited a 2nd general contractor (Valley Builders) to bid on the project and their
cost was $66128.00. I did this because the cost estimate in February 2020 from Severson had
increased significantly. To my surprise, the estimate from Valley Builders was even higher than
Severson’s estimate.
Update: July 2020
I spoke with both General Contractors and they both felt they could hold firm on the estimated
cost of the project. The only thing that could cause an increase would be a Covid-19 Laborer
issue and that would be an unforeseen problem (something like limited crew size or limited
working hours).
Both contractors suggested starting as soon as possible to help eliminate the possible Covid-19
concerns. They suggested starting in late November early December, this would have the project
complete shortly after January 15, 2021.
ONE VISION. ONE MISSION. LINO LAKES PUBLIC SAFETY DEPARTMENT.
Lino Lakes Public Safety
TO: Director John Swenson
FROM: Captain William Owens
DATE: June 17, 2020
RE: LiveScan Device
Director Swenson, as you are aware from our previous discussions, suspense files in our criminal justice
records is a public safety concern for our agency. Because suspense records are incomplete criminal
justice information, they impact our ability to accurately manage our records and have potential to
impact our responsibility to issue firearms permits, clearance letters, and effectively assist prosecution
of criminal offenses. I requested Records Tech Brooke Jacobson to investigate how we can impact
suspense files from our agency. Ms. Jacobson provided the following information:
When a criminal justice record is in ‘suspense,’ it means a court disposition cannot be linked to a criminal history
arrest record. Suspended court dispositions have a serious impact across the criminal justice system.
An inaccurate criminal history could lead to convicted offenders being cleared for firearms purchases or
employment in “sensitive” positions.
Public safety and security is eroded as flight risks increase.
A prosecutor’s efficiency can also be decreased because of the need to manage a noncustodial subject and
ensure their processing. If the subject does not cooperate, contempt charged could lead to additional
expenditure of time and resources.
The court’s efficiency can also be decreased because of a rescheduled court appearance and the need to
spend time and resources correcting suspended court dispositions.
The effectiveness of courts can be reduced. Prosecutors and court personnel may be impeded because of
an inability to:
o Confirm subject’s identity
o Confirm controlling agency (CAG)
o Sufficiently review the subject’s criminal history
o Successfully prosecute and adjudicate based on current and historical fact
When fingerprint cards are not submitted to the BCA, suspended court dispositions can occur. There are a number of
reasons why suspense records occur.
o A subject being cited and released without booking
o A subject appears in court and is not fingerprinted
o Poor quality fingerprints were taken and rejected by either Livescan or the BCA without replacements being
submitted
o Arrest data being formatted incorrectly or omitted, causing rejection by Livescan or BCA
o Other poorly-defined or followed business practices
A subject having a Suspense record reflects an inaccurate criminal history of an offender. In turn, offenders having a
Suspense record, officers do not have a correct criminal history of a subject for charging purposes or safety
concerns. Our agency currently has 895 suspense records, the majority of which are DWIs. In 2017, there were 184
and in 2018, there were 91 DWIs arrests made. Suspense began being a priority in December 2017 and resolutions
of more than 200 suspense records have been found. With that being said, it takes a significant amount of time to
research each record. In previous years many different ideas were brought up in order for subjects to be fingerp rinted
to resolve each record. Many have been used and almost all have failed to be a timely or reliable solution. Currently a
record is researched to see what is missing, if a fingerprint card is needed then a fingerprint request form is filled out
and sent to our contact in Probations. Probations then look up the subject and if they are on probation a letter is sent
requesting fingerprints. If they are not on probation then the only option we have is to send a letter which has been
drafted with the appropriate State Statute requesting the subject get fingerprinted at the Anoka County Jail.
Our agency’s suspense can be greatly reduced with the use of a Livescan. Our officers do not have to leave the city
to book a 4th Degree DWI. When they are at base with the subject the whole process can be done at the same time
as the DMT. All the information that the officer obtains will then be directly submitted to the BCA, thus reducing our
suspense.
Ms. Jacobson proposes we “book” all our misdemeanor criminal offenses at the police station.
This would meet statutory obligations to fingerprint and photograph subjects and will link the arrest to
their criminal prosecution, thereby positively impacting suspense records in Lino Lakes. As Ms. Jacobson
implies, the alternative to impacting our suspense files without completing a booking process at our
police station, is to have our police officers begin to transport all misdemeanor criminal offenses to the
Anoka County Jail for booking. This will impact our service abilities while those officers are out of the
city.
Beyond criminal suspense files, we may use the LiveScan device to assist us with civil fingerprint
services and employment background processes. Currently we use ink and paper to take fingerprints for
citizens. Using a LiveScan for this service will allow us to be more efficient and avoid person-to-person
contact.
BCA requirements for law enforcement agencies “booking” subjects requires fingerprints and
photograph.