Laserfiche WebLink
(MnDOT 3861.2C)345a5b43425a2110665b5b(MnDOT 2571.3F2)(SHIGO METHOD)BRANCH BARKRIDGEDEADBRANCH(MnDOT 2571.3K2a9 and 2571.3E1)LIVE BRANCHGENERAL NOTESSEE SPECIAL PROVISIONS FOR SPECIFIC PROJECT REQUIREMENTS.REFER TO MnDOT SPECIFICATIONS 2571, 3861, AND THE INSPECTION ANDCONTRACT ADMINISTRATION MANUAL FOR MnDOT LANDSCAPE PROJECTS" FORGENERAL REQUIREMENTS.COMPLETE PREPARATORY WORK BEFORE STARTING INITIAL PLANTING OPERATIONS.ACCEPT ALL PLANT STOCK IN ACCORDANCE WITH (MnDOT 3861) PRIOR TO PLANTING.THE CONTRACTOR WILL DEMONSTRATE COMPETENCY FOR SOIL CULTIVATIONOPERATIONS IN ACCORDANCE WITH (MnDOT 2571.3D2 STEP 4)THE CONTRACTOR WILL DEMONSTRATE COMPETENCY FOR ALL PLANT INSTALLATIONOPERATIONS IN ACCORDANCE WITH (MnDOT 2571.3F1)RODENTPROTECTIONSEE SPECIAL PROVISIONS AND STANDARD PLANTING DETAILS (C)FERTILIZERSEE SPECIAL PROVISIONSCOMPOSTMnDOT 3890 GRADE 2 UNLESS OTHERWISE SPECIFIED.MULCHMATERIALMnDOT 3882 TYPE 6 UNLESS OTHERWISE SPECIFIED.MASSPLANTINGBEDSPREPARE MASS PLANTING BEDS FOR PLANTS PLACED AT ___ ORLESS, UNLESS OTHERWISE SPECIFIED ON SHEETS. PLANT BEDS INSTAGGERED ROWS ON THE PERIMETER FIRST, THEN UNIFORMLYFILL IN WITH REMAINING PLANTS. USE TRIANGULAR SPACING,UNLESS SPECIFIED OTHERWISE. PROVIDE 5' RADIUS CLEAR OFSHRUBS AROUND EACH DECIDUOUS TREE AND 8' CLEAR RADIUSAROUND EACH CONIFER TREE. RADIUS WILL BE MEASURED FROMTHE CENTER OF THE TREE TO THE CENTER OF THE SHRUB.NOTIFY ENGINEER OF GROSS PLANT QUANTITY SURPLUS ORDEFICIENCY IMMEDIATELY. MULCH ENTIRE MASS PLANTING BED.SEE STANDARD PLANTING DETAILS (C)TREEPAINTING(FROSTCRACKPREVENTION)PAINT OAK, LINDEN, LOCUST, MAPLE, CRABAPPLE AND MOUNTAINASH. ONLY UNDILUTED EXTERIOR WHITE LATEX PAINT ISACCEPTABLE. PAINT TREE CIRCUMFERENCE FROM GROUND LINE TOFIRST MAJOR BRANCH.PLANTING PLANDIMENSIONSSTATED DIMENSIONS SUPERCEDE SCALING FROM PLAN.WATERING GUIDELINES (MnDOT 2571.3G)PLANT TYPEAVERAGE GALLONS OFWATER PER APPLICATIONMACHINE TRANSPLANTEDTREES50-100BALLED AND BURLAPPEDTREES20BARE ROOT AND CONTAINERTREES15BALLED AND BURLAPPEDSHRUBS10BARE ROOT AND CONTAINERSHRUBS7WOODY SEEDLINGS4PERENNIALS AND VINES3IT IS THE CONTRACTOR'S RESPONSIBILITY TO MONITOR ANDMAINTAIN SOIL MOISTURE AT ADEQUATE BUT NOT EXCESSIVELEVELS. THE AMOUNTS LISTED ABOVE ARE GUIDELINES, NOTREQUIREMENTS.ACCEPTABLE PLANT STOCK GROWING RANGE LIMITSSOURCE: USDA PLANT HARDINESS ZONE MAPooooCANADANDSDNEMNIAKSMOILINOHMIWIMTWYCOPANYooPLANT INSTALLATION PERIODPROJECT LOCATIONPLANTING SOILDIRECTION OFSPADINGMACHINEDIRECTION OFSPADINGMACHINE(MnDOT 2571.3D2)CULTIVATEDINPLACE SOILDEPTH(MnDOT 2571.3D2)CORRECTPRUNINGCUTTOOCLOSETOOLONGTOOSLANTEDPRUNINGBRANCHES PRUNED TO LIVE BUDBRANCHES PRUNED AT TRUNKLIVE BUDBRANCH COLLARAA12" <br />16"ZONESLEGEND MIN. TEMP.34FOR ALL PLANT STOCK, DOCUMENT ACCEPTABILITY FOR HARDINESS IN THEMINNESOTA ZONE WHERE THE PROJECT SITE IS LOCATED, AS FOLLOWS:A.PLANT STOCK CONTINUOUSLY GROWN FOR AT LEAST THE LAST TWOYEARS WITHIN THE ACCEPTABLE LIMITS SHOWN.ORB.PLANT STOCK, GROWN OUTSIDE THE ACCEPTABLE GROWING RANGELIMITS, HAVING SEED SOURCE OR ROOT AND GRAFT STOCKORIGINATING FROM THE ACCEPTABLE LIMITS SHOWN. -34.4 TO -40 F -28.9 TO -34.4 F -26.1 TO -28.9 F5aQUEBECONTARIOSASKATCHEWANMANITOBALAKELAKE <br />LAKELAKELAKESUPERIORMICHIGAN <br />HURONERIE <br />ONTANOZONESLEGENDACCEPTABLE ZONESUNACCEPTABLE ZONESLAKE <br />0, 1, 2,5b and 6PLANTING DATES BY ZONE34SPRING <br />DECIDUOUS <br />BAREROOT APRIL 21 APRIL 7TOTO JUNE 1 JUNE 1CONTAINERB&B APRIL 21 APRIL 7TOTO JUNE 30 JUNE 30CONIFEROUS APRIL 21 APRIL 7TOTO JUNE 1 MAY 17PERENNIALS MAY 1 MAY 1TOTO JUNE 30 JUNE 30SEEDLINGS APRIL 21 APRIL 7TOTO JUNE 1 JUNE 1FALL <br />DECIDUOUS <br />BAREROOTOCT. 1OCT. 10TOTONOV. 1NOV. 15CONTAINERB&BAUG. 25AUG. 25TOTOOCT. 15NOV. 1CONIFEROUSAUG. 25AUG. 25TOTOSEPT. 15SEPT. 15PERENNIALSAUG. 25AUG. 25TOTOSEPT. 15SEPT. 151.BARE ROOT PERENNIALS MUST BEINSTALLED IN THE SPRING NO LATER THANJUNE 1ST OR FOLLOW THE FALLDECIDUOUS PLANTING DATES.2.ACTUAL DATES MAY CHANGE DEPENDINGUPON SEASONAL CONDITIONS, ASDETERMINED BY THE ENGINEER.3.FALL PLANTING IS NOT ALLOWED FORBARE ROOT FORM OF THE FOLLOWINGSPECIES: HAWTHORN, DOGWOOD, POPLAR,HACKBERRY, LINDEN, IRONWOOD,HONEYLOCUST, BIRCH, MOUNTAIN ASH,MAPLE, WILLOW, CRABAPPLE, PLUM/CHERRY,OAKS, AND SUMAC.4.ALL REPLACEMENT PLANTS MUST BEINSTALLED DURING THE MONTH OF MAY(SPRING PLANTING) AND SEPTEMBER (FALLPLANTING) DURING THE FIRST YEAR OF THEPLANT ESTABLISHMENT PERIOD.5.MACHINED MOVED PLANTING DATES WILLBE SPECIFIED IN THE SPECIAL POVISIONS.STEPS TO PRUNING WITH PRUNINGSAW:1.CUT PART WAY THROUGH THEBRANCH AT POINT A.2.CUT COMPLETELY THROUGHBRANCH FROM POINT B TO A.3.AT BRANCH COLLAR CUT FROMPOINT C TO D.INCORRECT CUT FROM POINT C TO X (TOO CLOSE) WILL RESULT INDISCONTINUOUS CALLUS FORMATIONAFTER ONE SEASON OF GROWTH.CORRECT CUT FROM POINT C TO D(LEAVING BRANCH COLLAR BUT NOTTHE STUB FROM POINT B TO A)WILL RESULT IN CONTINUOUSDOUGHNUT SHAPED CALLUSFORMATION AFTER ONE SEASON OFGROWTH.PRUNING NOTES:1.PRUNE USING CLEAN ANDSHARP SCISSOR-TYPE PRUNEROR PRUNING SAW.2.THE BEST TIME TO PRUNE ISLATE DORMANT SEASON OREARLY SPRING.3.AVOID PRUNING OAKS IN APRIL,MAY, JUNE OR JULY.4.IF PRUNING IS NECESSARY ORIF WOUNDS OCCUR TO OAKTREES IN APRIL, MAY, JUNE ORJULY, IMMEDIATELY PAINT CUTSURFACE OR WOUND WITHLATEX PAINT OR SHELLAC.D4 INCHES OF GRADE 2COMPOST AND OTHERSPECIFIED ADDITIVESTHOROUGHLY MIXED WITHINPLACE CULTIVATED SOILSPRIMARY TILLAGE - PASS 1INCORPORATION TILLAGE - PASS 2BBCCDXK:\016591-000\Cad\Proposed\016591-000_L-SITE-PLANTING PLAN.dwg 9/1/2020 4:42:09 PM <br />TOTSHEET OFSHEETSANOKA COUNTY, MINNESOTACSAH 34 (Birch Street) ImprovementsAnoka County Highway DepartmentS.A.P. 002-634-003 & S.A.P. 210-020-010XTOTL1.2