My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-08-2020 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
09-08-2020 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 4:24:26 PM
Creation date
11/17/2021 11:52:23 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2020
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WS – Item 5 <br />WORK SESSION STAFF REPORT <br />Work Session Item No. 5 <br /> <br />Date: September 8, 2020 <br /> <br />To: City Council <br /> <br />From: Diane Hankee, PE City Engineer <br /> <br />Re: CR J (Ash Street) and CSAH 49 (Hodgson Road) Trunk Utility Project <br /> <br />Background <br /> <br />The City Council authorized the preparation of plans and specifications for the CR J and CSAH <br />49 (Hodgson Rd) Trunk Utility Project on March 26, 2018. The purpose of the improvement is <br />to provide sanitary sewer and water service to approximately 60 acres of property surrounding <br />the CR J and CSAH 49 intersection and to strengthen the City’s water pressure in this area of the <br />City. The sewer and water improvements are in conformance with the City’s Comprehensive <br />Utility Plans. <br /> <br />The project includes a sanitary sewer lift station, forcemain, and re-routing the existing sewer <br />flow of 12 Lino Lake’s properties that are currently serviced by Shoreview. The project also <br />includes a trunk water loop along the east side of Hodgson from 6074 Hodgson Road north to <br />Linda Lane. The water loop will eventually continue through the proposed Lyngblomsten site to <br />Woodridge Lane and will provide improved water pressure in this area. <br /> <br />The City purchased an easement from 255 Ash Street in 2019 to extend utilities to Woodridge <br />Lane. The developer of the Lyngblomsten project purchased 275 Ash Street where the utilities <br />will also extend through. WSB has completed the construction plans and specifications. As the <br />Lyngblomsten project moves forward, staff will concurrently present the CR J and CSAH 49 <br />(Hodgson Rd) Trunk Utility Project for bid. <br /> <br />The total estimated construction cost including a 5% contingency is: <br /> <br /> <br /> <br /> <br /> <br />DESCRIPTION <br /> ESTIMATED <br />AMOUNT <br /> SCHEDULE A. - SURFACE IMPROVEMENTS $88,494.00 <br /> SCHEDULE B. - SANITARY SEWER IMPROVEMENTS $532,047.60 <br /> SCHEDULE C. - WATERMAIN IMPROVEMENTS $287,647.50 <br /> <br /> <br /> <br /> <br /> <br /> TOTAL CONSTRUCTION $908,189.10 <br /> <br /> <br />Funding for the CR J and CSAH 49 (Hodgson Rd) Trunk Utility Project is through the Trunk <br />Area and Unit fund.
The URL can be used to link to this page
Your browser does not support the video tag.