Laserfiche WebLink
5 <br /> <br />Transportation Plan and provide a north-south corridor. The 1999 Anoka County TH <br />242/CSAH 14 Access Management Plan identifies at-grade full access at Wood Duck Trail and <br />CSAH 23 (Lake Drive) and restricted movements along the site’s corridor. The site plan has <br />been reviewed by Anoka County Highway Department. They have identified the need for <br />additional right-of-way (70-75 feet) and right and left turn lanes on CSAH 14 (Main Street). <br />Twelve foot wide east bound and west bound turn lanes have been shown on the site plan. <br />Detailed construction plans have been submitted with the PUD Final Plan/Final Plat and are <br />being reviewed by Anoka County. <br /> <br />The internal road system (Streets A thru C) has 60 foot wide right-of-ways and 32 foot wide <br />(back to back) paved road surface. Street D (Hazelwood Court) and Street E (Elmwood Court) <br />are cul de sacs with 60 foot wide right-of-way and 30 foot wide (back to back) paved road <br />surface. The intersection of Street A and CSAH 14 (Main Street) has an 80 foot wide right-of- <br />way and 42 foot wide (back to back) paved road surface. Sidewalks are proposed along the <br />east side of both Glenwood Drive and Haywood Drive. <br /> <br />Haywood Drive terminates in a temporary dead-end to the west, abutting 8024 Wood Duck <br />Trail. This stub provides opportunity for future extension and residential development to Wood <br />Duck Trail. This is consistent with the County Access Management Plan. Haywood Drive also <br />terminates in a temporary cul de sac to the north and provides opportunity for future extension <br />to the north. <br /> <br />Street B (Basswood Drive) provides future access to Lino Lakes Elementary School to the east. <br />In 2017, the school began a building remodeling and parking lot reconstruction project. An <br />opportunity to eliminate the school’s west driveway and connect with Natures Refuge was <br />identified as a safety benefit. The City and Anoka County are working with the school district <br />to complete this connection. Ultimately, it is the school districts decision when to make this <br />connection. <br /> <br />Easements <br /> <br />Standard drainage and utility easements at least 10 feet wide are provided along all lot lines. <br />Easements at least 20 feet wide are provided over utility pipes. <br /> <br />Drainage and utility easements are dedicated 10 feet above the high water level over <br />stormwater drainage ponds and 10 feet outward from the delineated wetland boundary. This <br />requirement is satisfied because easements have been dedicated over the entire outlots. Rear <br />lot lines also have a minimum 10 foot wide easement. <br /> <br />A 100 foot wide private utility easement in favor of Great River Energy exists along the <br />southern boundary of the development. <br /> <br />Landscaping shall be allowed in the drainage and utility easements covering the 15 foot wide <br />landscape buffer area in Outlot E and Outlot F. <br /> <br /> <br /> <br />