My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-05-2020 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
10-05-2020 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 4:24:27 PM
Creation date
11/17/2021 11:55:00 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/05/2020
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Senior Water Resources <br />Project Engineering Project Project Office Survey Environmental Two Person Total <br />Manager Specialist VI Engineer Engineer Technician Coordinator Scientist Survey Crew Hours Cost <br />Description <br />2021 Reconstruction -4th Ave, Talle, Karth, Joyer <br />Construction Plans <br />Survey 2.2 miles 2 2 4 24 32 5,600.00$ <br />Public Engagement Respond to Drainage 24 12 6 12 2 56 8,410.00$ <br />Road Design (Alignment, x-section)10 40 12 16 6 84 11,800.00$ <br />Cad for roadways 2 310 24 2 338 48,058.00$ <br />Culvert replacememt and Drainage- RCWD model 20 40 12 30 4 106 15,430.00$ <br />Quality Review 6 6 972.00$ <br />RCWD Preperation & Permit 8 20 26 20 74 10,500.00$ <br />Specifications and Bid Administration <br />Specifications 2 6 24 4 8 44 5,722.00$ <br />Quantity Estimates 2 4 6 2 14 1,986.00$ <br />Bid Documents 1 2 2 10 15 1,637.00$ <br />Cost Estimate 2 2 4 2 10 1,432.00$ <br />Quality Review 4 1 6 2 13 1,881.00$ <br />Subtotal 82 436 122 90 28 4 6 24 792 113,428.00$ <br />2021 Rehabilitation -Post, Forsham, Stage Coach <br />Construction Plans <br />Road Design (Alignment, x-section)16 8 8 32 4,808.00$ <br />Cad for roadways 2 80 82 11,764.00$ <br />Water Systems 12 10 2 24 3,642.00$ <br />Quality Review 6 2 8 1,240.00$ <br />RCWD Preperation & Permit 2 12 16 8 1 39 5,422.00$ <br />Specifications and Bid Administration <br />Specifications 6 8 18 8 40 5,280.00$ <br />Quantity Estimates 4 6 16 1 27 3,793.00$ <br />Bid Documents 1 8 6 2 6 23 2,960.00$ <br />Cost Estimate 4 12 12 28 3,972.00$ <br />Quality Review 2 1 1 4 552.00$ <br />Subtotal 55 144 81 11 16 307 43,433.00$ <br />Grand Total Hours 137 580 203 101 44 4 6 24 1099 156,861.00$ <br />Hourly Rate 162.00 143.00 134.00 143.00 94.00 162.00 143.00 185.00 <br />Grand Total Direct Labor Costs 22,194.00$ 82,940.00$ 27,202.00$ 14,443.00$ 4,136.00$ 648.00$ 858.00$ 4,440.00$ 156,861.00$ <br />Total Fee (Hourly not to exceed) 156,861.00$ <br />Engineering Fee Estimate <br />For the City of Lino Lakes <br />5-Oct-20 <br />2021 Street Improvement Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.