Laserfiche WebLink
Pavement Management Plan <br />OCI is based on a 0 to 100 scale, with 100 being a road in perfect condition. <br />The 20 weighted average OCI for bituminous roads within Lino Lakes is 70.97. <br />The City has added new roadways in the recent years, helping keep the average high. <br />The roadway conditions are separated into three separate categories: Adequate, Marginal, and <br />Problem. Marginal roadways require roadway preservation and Problem roadways require <br />reconstruction. <br />The Pavement Management Report identified the need to focus on the Marginal roadways so <br />that they wouldn’t fall into the more expensive Problem category. <br />The 2020 percentages of bituminous roadways in these categories are as follows: <br />Adequate (PCI of 70.01-100) –65.0% (65 miles) <br />Marginal (PCI of 40.01-70.00) –20.3% (20 miles) <br />Problem (PCI of 0.00 –40.00) –14.6% (15 miles) <br />4