Laserfiche WebLink
2021 Street Improvement Projects <br />2021 Street Rehabilitation Project: <br />2021 funding,including a pavement fund balance carried forward, and next year’s proposed <br />budget of $711,112.00, is a total of $855,000.00. The proposed improvements include: <br />Full Depth Mill and Overlay / Reclamation (approximately 0.6 miles)–Forsham Lake Drive, Post <br />Road, and Stage Coach Trail (from cul du sac north 1,400 feet). The estimated project cost is <br />$795,000.00 including water system repairs. <br />Thin Overlay (approximately 1.6 miles)–James Street, Knoll Drive and Oak Lane. Thin overlays <br />are planned to address Problem roadways in need of reconstruction that the City cannot fund in <br />the short term. The estimated project cost is $170,000.00. This portion of the project will be bid as <br />an alternate to maintain project flexibility. <br />Staff will also initiate a separate preventative maintenance project for roads in the Adequate <br />category. These will include streets in more recent developments <br />9