Laserfiche WebLink
Utilities•Flow is collected along East Cedar Street and conveyed east to <br />MCES Meter M220. <br />•Outlot A, NP 5th Addition = Utility Staging Area 1A (2018- <br />2025). <br />•2 of the 3 Burque parcels = Utility Staging Area 1B (2025- <br />2030). <br />•3rd Burque parcel = Utility Staging Area 3 (Post 2040). <br />22