Laserfiche WebLink
CITY OF LINO LAKES <br /> <br />RESOLUTION NO. 20-115 <br /> <br />RESOLUTION AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS <br />FOR THE 2021 STREET IMPROVEMENT PROJECTS <br /> <br />WHEREAS, the City Council finds that it would be in the best interest of the City to proceed with <br />the preparation of plans and specifications for the 2021 Street Improvement Projects: <br /> <br />2021 Street Reconstruction Project: <br /> <br />Full Depth Reclamation (approximately 2.2 miles) – Joyer Lane, Karth Road, Talle Lane, <br />Canfield Road, and Gaage Lane neighborhood roadways, and 4th Avenue (Main Street to <br />Pine Street). <br /> <br />2021 Street Rehabilitation Project: <br /> <br />Full Depth Mill and Overlay / Reclamation (approximately 0.6 miles) – Forsham Lake <br />Drive, Post Road, and Stage Coach Trail (from cul du sac north 1,400 feet). Including <br />water system repairs. <br /> <br />Thin Overlay (approximately 1.6 miles) – James Street, Knoll Drive, and Oak Lane. <br /> <br />NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes <br />authorizes the preparation of the plans and specifications for the 2021 Street Improvement <br />Projects. <br /> <br />Adopted by the Council of the City of Lino Lakes this 12th day of October, 2020. <br /> <br />The motion for the adoption of the foregoing resolution was introduced by Council Member <br />_______________and was duly seconded by Council Member ________________ and upon <br />vote being taken thereon, the following voted in favor thereof: <br /> <br />The following voted against same: <br /> <br /> <br />_______________________________ <br />Rob Rafferty, Mayor <br />ATTEST: <br /> <br />________________________ <br />Julianne Bartell, City Clerk