My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-12-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
10-12-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 4:29:51 PM
Creation date
11/17/2021 11:55:33 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/12/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3 Pavement Condition Report <br /> <br />Pavement Condition Report <br />Existing Pavement Condition <br />This report shows the latest pavement conditions using PAVER, which is an <br />asset management software used to record and estimate the conditions of the <br />roadways. <br />In the field, PAVER calculates the PCI using the deduct values, which are based <br />on the distress type, distress severity, and distress quantity. Conditions of <br />roadways that were not inspected this year were estimated using the default <br />pavement performance curve (as shown in Figure I). The graph below <br />represents a typical bituminous pavement deterioration rate, and it may vary <br />depending on the type of maintenance activities performed over the period of <br />pavement life. <br /> <br />Figure I. Bituminous pavement performance curve applied to all the <br />bituminous roadways in the City of Lino Lakes. <br />Table II shows a breakdown of the pavement overall condition in the City. The <br />PCI values obtained were based on visual inspections and the recommended <br />strategies for each category shall only be used as guidelines. Additional <br />investigation such as pavement forensics or pavement boring would be required <br />prior to project selection and design. <br /> <br />0 <br />10 <br />20 <br />30 <br />40 <br />50 <br />60 <br />70 <br />80 <br />90 <br />100 <br />0 5 10 15 20 25 30 35 40PCI <br />Years in Service (Age) <br />PAVEMENT PERFORMANCE CURVE
The URL can be used to link to this page
Your browser does not support the video tag.