My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-09-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
11-09-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 10:00:22 AM
Creation date
11/17/2021 11:58:50 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/09/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Construction Project Construction Two Person Project Controls Construction <br />Engineer Inspector Survey Crew Administration Total <br />WORK TASK 10/30/2020 Staff Staff Staff Hours Cost <br />Task Description <br />A PROJECT MANAGEMENT <br />Project Management 8 8 16 $1,864.00 <br />B CONTRACT ADMINISTRATION <br />Pre-Construction Conference 2 2 1 1 6 $824.00 <br />Weekly Meeting (Assume 6 meetings)6 6 $858.00 <br />Documentation Review 6 2 8 $1,038.00 <br />Monthly Pay Estimates (Assume 3)3 3 4 10 $1,167.00 <br />Final Pay Voucher 3 1 1 5 $645.00 <br />C CONSTRUCTION INSPECTION SERVICES <br />Pre-Project Inspection / Removal Measurements 10 10 $1,260.00 <br />Full Time Construction Inspection (6 Weeks)210 210 $26,460.00 <br />Traffic Control Inspection / Haul Roads 10 10 $1,260.00 <br />Punchlist/Final Inspection 20 20 $2,520.00 <br />Design Engineer On Site 8 8 $1,144.00 <br />E SURVEY <br />Construction Staking & Coordination 32 32 $6,272.00 <br />Survey Data Processing 4 4 $572.00 <br />Record Plans 6 16 22 $3,994.00 <br />Assume 5 days per week, 7 hours per day. <br />Total Hours 46 256 49 2 14 367 $49,878.00 <br />Labor Rate Hourly Costs 143.00 126.00 196.00 90.00 90.00 <br />6,578.00 32,256.00 9,604.00 180.00 1,260.00 $49,878.00 <br />TOTAL $49,878.00 <br />ESTIMATE OF COST - North East Drainage Improvement Project <br />City of Lino Lakes, Minnesota <br />Total Labor Rate <br />WSB
The URL can be used to link to this page
Your browser does not support the video tag.