My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-09-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
11-09-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 10:00:22 AM
Creation date
11/17/2021 11:58:50 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/09/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or Seed) -$ No Fee <br />Driveway Replacement Permit 69.00$ <br />67.00$ <br />Sign Permit: Existing Billboard 85.00$ /Year <br />Sign Permit: Permanent See Building Fee Table <br />Sign Permit: Sandwich Board 25.00$ <br />Sign Permit: Temporary (portable/banner) 25.00$ /Term <br />Storm Pond Aeration Permit 150.00$ <br />All permits issued are subject to applicable State surcharge fees. <br />* Inspections made outside of normal business hours is a three-hour minimum charge. <br />** <br />*** Actual costs include administrative and overhead costs. <br />ESCROW DEPOSITS <br />a. Driveway - $1,000.00 <br />b. Exterior Concrete - $1,000.00 <br />c. As-built Surveys - $1,000.00 <br />d. Stucco (final coat only) - $1,000.00 <br />e. Garage Floor - $1,000.00 <br />f. Landscaping - $2,500.00 (landscaping may be escrowed year-round per City Staff) <br />g. Other – Determined by City staff at a rate of 125% of the actual improvement costs <br />Escrow deposits will be charged a $100.00 non-refundable administrative fee. <br />Escrow deposits can be submitted through one of the following procedures: <br />a. <br />Fee Refund – Per applicant request, City staff may refund permit fees up to 80% for voided permits. Plan review <br />fees and state surcharge fees are non-refundable. No refund shall be provided if permit has expired. <br />Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan <br />revision and construction observation. <br />Escrow can be paid to the City upon execution of an agreement signed by both the payee and the <br />City. <br />In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be <br />completed due to inclement weather, as determined by City Staff, whereupon a Temporary Certificate of <br />Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any <br />unfinished work must be completed within six months (weather permitting) from the date of issuance. The <br />following escrow amounts are hereby established:
The URL can be used to link to this page
Your browser does not support the video tag.