My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-23-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
11-23-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 10:00:23 AM
Creation date
11/17/2021 11:59:18 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/23/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITY FEES <br />Sewer Utility Rates <br />Water Utility Rates <br />Late Penalty 10% of Unpaid Balance, Assessed Quarterly <br />Water Meter Rental 600.00$ Deposit <br />25.00$ /Month <br />Additional Accessories 25.00$ /Month <br />Water Usage Fee 5.00$ /1,000 Gallons <br />Utility Non-Payment Certification Fee 30.00$ <br />Meter Testing (Our Cost, Delivered To Minneapolis) 100.00$ 5/8" - 3/4" Meter Test <br />150.00$ 1" Meter Test <br />250.00$ 1-1/2" - 2" Meter Test <br />Water Use Violation 25.00$ 1st Violation <br />50.00$ 2nd and Subsequent Violations <br />Trunk Charge <br />Sanitary Sewer 1,630.00$ /Unit <br />Water 2,341.00$ /Unit <br />Availability Charge <br />City Sewer (CSAC) 1,525.00$ /SAC Unit <br />City Water (CWAC) 1,473.00$ /SAC Unit <br />To be considered by separate Ordinance, No. <br />11-13 <br />City Trunk Utility Connection Fees - The Trunk Utility Connection Fee consists of two components: a Trunk <br />Charge and an Availability Charge. <br />The trunk charge shall be paid at the time of subdivision approval or at the time of hook-up, <br />whichever is first. Residential trunk charges are based on one unit per dwelling unit. <br />Commercial/Industrial/Institutional (CII) trunk charges are based on a factor of 2.92 units per acre. <br />For residential properties, the availability charge shall be paid at the time of subdivision approval or <br />at the time of hook-up, whichever is first. Commercial/Industrial/Institutional availability charges <br />shall be paid at the time of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES). Residential uses <br />shall be assigned one unit per dwelling unit unless otherwise noted by MCES. <br />To be considered by separate Ordinance, No. <br />11-13 <br />8
The URL can be used to link to this page
Your browser does not support the video tag.