My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-23-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
11-23-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 10:00:23 AM
Creation date
11/17/2021 11:59:18 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/23/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Shadow Lake Drive Area <br />Street & Utility Improvement <br />Project <br />Final Pay Voucher 14 <br /> <br /> Page 10 of 11 <br />Contract Item Status <br />Line <br />No. Item Description Units Unit Price Contract <br />Quantity <br />Quantity <br />This <br />Voucher <br />Amount This <br />Voucher <br />Quantity <br />To Date Amount To Date <br />175 2506.603 CONSTRUCT 48" DIA SANITARY <br />MANHOLE L F $228.00 52 0 $0.00 43.9 $10,009.20 <br />176 2021.501 MOBILIZATION LS $5,000.00 1 0 $0.00 1 $5,000.00 <br />177 2105.601 DEWATERING LS $0.01 1 0 $0.00 0 $0.00 <br />178 2504.602 CONNECT TO EXISTING WATER <br />MAIN EACH $1,917.00 1 0 $0.00 1 $1,917.00 <br />179 2504.602 HYDRANT EACH $4,850.00 1 0 $0.00 1 $4,850.00 <br />180 2504.602 6" GATE VALVE & BOX EACH $1,050.00 1 0 $0.00 1 $1,050.00 <br />181 2504.602 8" GATE VALVE & BOX EACH $1,350.00 1 0 $0.00 1 $1,350.00 <br />182 2504.603 6" WATERMAIN DUCTILE IRON CL <br />52 L F $54.00 54 0 $0.00 54 $2,916.00 <br />183 2504.603 8" WATERMAIN HDPE <br />(DIRECTIONAL DRILLED) L F $36.00 2245 0 $0.00 2245 $80,820.00 <br />184 2504.604 POLYSTYRENE INSULATION S Y $55.00 20 0 $0.00 0 $0.00 <br />185 2504.608 DUCTILE IRON FITTINGS LB $8.00 520 0 $0.00 375 $3,000.00 <br />Bid Totals: $95,901.49 $4,716,308.40 <br /> <br />Project Category Totals <br />Category Amount This Voucher Amount To Date <br />ALTERNATE 1 - WATERMAIN & SANITARY SEWER IMPROVEMENTS <br />(SOUTHERN TRUNK) $0.00 $170,439.21 <br />ALTERNATE 2 - WATERMAIN IMPROVEMENTS (MIDDLE TRUNK) $0.00 $100,903.00 <br />SCHEDULE A - STREET IMPROVEMENTS $69,432.41 $2,513,100.22 <br />SCHEDULE B - DRAINAGE IMPROVEMENTS $20,279.08 $491,338.96 <br />SCHEDULE C - CULVERT IMPROVEMENTS $4,690.00 $349,264.01 <br />SCHEDULE D - SANITARY SEWER IMPROVEMENTS $1,500.00 $512,394.00 <br />SCHEDULE E - WATERMAIN IMPROVEMENTS $0.00 $578,869.00 <br /> <br />Contract Change Item Status <br />CC CC <br />No. <br />Line <br />No. Item Description Units Unit Price Contract <br />Quantity <br />Quantity <br />This <br />Voucher <br />Amount This <br />Voucher <br />Quantity <br />To Date Amount To Date <br />CO 1 15 2105.501 COMMON EXCAVATION <br />(EV) C Y $13.00 563 0 $0.00 563 $7,319.00 <br />CO 1 38 2531.501 <br />CONCRETE CURB & <br />GUTTER DESIGN <br />SURMOUNTABLE <br />L F $13.00 1145 0 $0.00 1145 $14,885.00
The URL can be used to link to this page
Your browser does not support the video tag.