My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-23-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
11-23-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 10:00:23 AM
Creation date
11/17/2021 11:59:18 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/23/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />November 13, 2020 <br /> <br />WSB <br />Kelsey Gelhar <br />Graduate Engineer <br />612-709-4897 <br /> <br />Project: 7685 Lake Dr Lino Lakes, MN <br /> <br />Estimate: Demolition $21,950.00 <br /> <br />INCLUDES <br />City Demolition Permit <br />Mobilization (Assuming One) <br />Supervision/Coordination <br />Dust Control During the Demolition Process <br />Building Removal Including Foundations <br />Legal Disposal and Recycling of Materials at approved facilities <br />Backfilling the basement with Clean fill materials <br />One Set of Septic Tank/Lines Pumping, & Removal <br /> <br />EXCLUDES <br />Hazardous Materials - Lead, Asbestos, Chemicals, Etc. <br />Regulated Materials Removal (Bulbs, Ballasts, Mercury Switches, Door Closures, Freon, Etc.) <br />Electrical / Mechanical / Water & Sewer Disconnects, Capping, Rerouting, Pipe Removal, Etc.(If any) <br />Erosion Control (Silt Fencing, Rock Entrance, Inlet Protection, Etc. <br />Construction/Safety Fencing / Site Security / Pedestrian and Vehicle Traffic Control, Etc. <br />Site Removals (Sidewalks, Parking Lot, Curb & Gutter, Fencing, Tree/Brush Removal, Etc.) <br />Site Restoration/Seeding/Sod/Landscaping <br />Shoring/Bracing/Underpinning <br />Contaminated Soils <br />Any / All Salvage for Owner or Other’s <br />Vibration Monitoring <br />Engineered Demolition Plan <br />Road Restrictions <br /> <br />Notes: -If this quote is not accepted within 30 days of the date of this proposal, this quote is not valid without <br /> written consent from Veit & Company, Inc. <br /> <br />If you have any questions, please call me at: 612-490-9756 (Mobile) <br /> <br />Respectfully, <br /> <br />Bhargav Kachhadiya <br />Estimator <br /> <br />I hereby authorize Veit & Co., Inc. to proceed with issuing a contract agreement for the above noted work. <br />Date:___________________ <br /> <br />By:____________________________ Title:________________________ 100% Payment Due Upon Completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.