My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-14-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
12-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 10:00:23 AM
Creation date
11/17/2021 12:00:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/14/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Poehling Addition <br />Development Agreement <br />December 14, 2020 <br /> page 7 <br />The City established trunk utility connection fees to uniformly distribute the <br />costs of public trunk water infrastructure. The Trunk Utility Connection Fee <br />consists of two components; a Trunk Charge and an Availability Charge. <br />Trunk Charge <br /> <br />The trunk charge shall be paid at the time of subdivision approval or at the time of <br />hook-up, whichever is first. Residential trunk charges are based on one unit per <br />dwelling unit. Commercial/Industrial/Institutional (CII) trunk charges are based on <br />a factor of 2.92 units per acre. <br /> <br />Water $2,306.00 Per Unit <br /> <br />Availability Charge <br /> <br />For residential properties, the availability charge shall be paid at the time of <br />subdivision approval or at the time of hook-up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the time <br />of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES). <br />Residential uses shall be assigned one unit per dwelling unit unless otherwise <br />noted by MCES. <br /> <br />City Water (CWAC) $1,451.00 Per SAC Unit <br /> <br />An estimate of the total charge and the trunk utility credit for developer installed <br />trunk oversizing is specified in Exhibit C. <br />e. Surface Water Management Area Charges <br />The City established a trunk area charge to uniformly distribute the costs of <br />public trunk surface water infrastructure and water quality improvements. The <br />Surface Water Management Charge shall be based on developable acreage, in <br />the amount specified in Exhibit C. The charge shall be paid at the time of <br />subdivision approval. <br />17. Assessment of Charges and Waiver of Rights. <br />a. In consideration of the construction of City Improvements listed in Paragraph 8 <br />and /or provision of sewer, water and storm water services, the Developer <br />agrees that the costs of City Improvements together with Trunk Sewer Unit <br />Charge, Trunk Water Unit Charge and the Surface Water Management Area
The URL can be used to link to this page
Your browser does not support the video tag.