My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-14-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
12-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 10:00:23 AM
Creation date
11/17/2021 12:00:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/14/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6G <br /> <br />STAFF ORIGINATOR: Diane Hankee, PE City Engineer <br /> <br />C. C. MEETING DATE: December 14, 2020 <br /> <br />TOPIC: Consider Resolution 20-151, Order Project, Approve the Plans <br />and Specifications and Authorize the Ad for Bid, 2021 Street <br />Improvement Projects <br /> <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting C ouncil approval to authorize the ad for bid for the 2021 Street Improvement <br />Projects. <br /> <br />BACKGROUND <br /> <br />On October 12, 2020, the City Council approved the preparation of the plans and specifications for <br />the 2021 Street Improvement Projects. The City plans to complete two projects in 2021, a Street <br />Reconstruction Project funded primarily with Street Reconstruction Bonds, and the City’s annual <br />Street Rehabilitation Project using Pavement Management Funds. Water system maintenance will <br />also be addressed where municipal utilities exist. The proposed projects for 2021 are as follows: <br /> <br />2021 Street Reconstruction Project: <br /> <br />Full Depth Reclamation (approximately 2.2 miles) – Joyer Lane, Karth Road, Talle Lane, Canfield <br />Road, and Gaage Lane neighborhood roadways, and 4th Avenue (Main Street to Pine Street). The <br />estimated total project cost is $2,600,000.00. <br /> <br />2021 Street Rehabilitation Project: <br /> <br />The estimated funding available for 2021, including a pavement fund balance carried forward and <br />next year’s proposed budget of $711,112.00, is a total of $855,000.00. The proposed improvements <br />include: <br /> <br />Full Depth Mill and Overlay / Reclamation (approximately 0.6 miles) – Forsham Lake Drive, Post <br />Road, and Stage Coach Trail (from cul du sac north 1,400 feet). The estimated project cost is <br />$795,000.00 including water system repairs. <br /> <br />Thin Overlay (approximately 1.6 miles) – James Street, Knoll Drive, and Oak Lane. Thin overlays <br />are planned to address Problem roadways in need of reconstruction that the City cannot fund in the
The URL can be used to link to this page
Your browser does not support the video tag.