My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-07-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
12-07-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 10:00:23 AM
Creation date
11/17/2021 12:01:46 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/07/2020
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WS – Item 2 <br />WORK SESSION STAFF REPORT <br />Work Session Item No. 2 <br /> <br /> <br />Date: December 7, 2020 <br /> <br />To: City Council <br /> <br />From: Andy Nelson, Environmental Coordinator <br /> <br />Re: Ash Tree Injection Program <br /> <br /> <br />Background <br /> <br />The City response to EAB includes removals of boulevard ash trees, replacement of these <br />trees with a diverse mix of species, and insecticide injections that allow us to stagger <br />removals over time. There are currently 317 boulevard ash trees remaining. Our goal is <br />to treat 100 trees per year until there are less than 200 trees remaining, followed by <br />treating half of the remaining trees each year until we have removed and replaced them <br />all. It will take the City about 10 years to remove and replace these trees, barring <br />acquisition of grant funding. <br /> <br />It took two workers about a month to treat 101 trees in the summer of 2020, and cost <br />$3,353.89 for wages, chemicals, and injection equipment.
The URL can be used to link to this page
Your browser does not support the video tag.