Laserfiche WebLink
I <br />I <br />SEED/SOD LINE <br />r , <br />/ RIP -RAP PER <br />CIVIL PLANS <br />Ix <br />I <br />O• Jf <br />5- <br />PROPERTY LINE <br />NATIVE SEED AREA <br />SEE NOTES. <br />' :.: �• <br />Am <br />4 ' \ 30'-TURF SOD STRIP <br />BEHIND CURB, CONTINUOUS. <br />BUFFER PLANTINGS, TYP. <br />X <br />5 ! X UTILITIES PER <br />5 <br />X CIVIL PLANS un <br />AV <br />SIDEWALK PER <br />CIVIL PLANS v <br />TRASH ENCLOS-URE <br />PER ARCH. PLANS. <br />r PAVING PE <br />SEED/SOD LINE <br />\PROPERT\7'LINIE / <br />ADJACENT DEVELOPMENT <br />NATIVE SEED AREA <br />SEE NOTES. <br />a <br />f-- SEED�/SOD LINE <br />q <br />Aa <br />I <br />GRADING PER <br />CIVIL PLANS <br />Landscape Materials Legend: <br />Proposed Turf Sod <br />Native Seed Area - See Sheet L1.2 for Mix <br />Landscape Requirements: <br />(a) Foundation Landscape: <br />2 Large Trees + 6 Large Shrubs per 100 If of Building: <br />260If Building = 3 Trees and 18 Shrubs <br />(b) Open Areas Landscape: <br />1 Large Tree + 3 Large Shrubs per 2,000 sf of Open Area: <br />6,150sf = 3 Trees and 9 Shrubs <br />(c) Basic Use Area Existing Trees To Remain: 0 <br />(d) Basic Use Area Trees To Be Removed: 0 <br />BUA Mitigation Trees Required: 0 <br />(e) Non -Basic Use Area Existing Trees To Remain: 0 <br />(f) Non -Basic Use Area Trees To Be Removed: 0 <br />Non BUA Mitigation Trees Required: 0 <br />(g) Existing Trees As Credit: 0 <br />(h) Required Bufferyards: <br />Between Parking Lot and Public ROW - 30" Hgt. <br />(i) Tree Canopy Coverage Calculations: <br />13,350 X 40% = 5,340sf required <br />Existing Trees: 0 <br />New Large Trees: 5 <br />New Medium Trees: 2 <br />New Small Trees: 0 <br />Total Coverage Provided: 5,700sf <br />Landscape Requirements: <br />1. See Civil Engineer's plans for grading layout and requirements. <br />2. Contractor to coordinate all work in the city right-of-way with <br />City of Lino Lakes Public Works Department. <br />3. Sod all disturbed areas except plant beds and mulch beds. <br />4. Install tree mulch ring on new trees planted in turf and seeded areas. <br />5. Refer to Sheet L1.2 for Plant Schedules, Notes, and Details. <br />6. All existing utilities must be field verified and located. <br />Consultant: <br />CAL YX <br />DESIGN GROUP <br />Landscape Architecture I Planning <br />475 Cleveland Avenue N. I Suite 101A <br />St. Paul, MN 55104 <br />telephone: 651.788.9018 <br />internet: www.calyxdesigngroup.com <br />Project: <br />Precision Tune <br />Auto Care <br />Lino Lakes, MINI <br />Certification: <br />Q <br />5 SCALE: AS NOTED <br />DATE: 11 /08/2021 <br />REVISIONS: <br />i <br />/ <br />I <br />co <br />I <br />RIP -RAP PER <br />CIVIL PLANS <br />xnow what's below. <br />\ Call before you dig. <br />LANDSCAPE PLAN: SCALE: 1" = 12'-0" NORTH <br />LANDSCAPE <br />PLAN <br />L1.1 <br />