Laserfiche WebLink
GRADING & EROSION CONTROL NOTES <br />• CONTRACTOR IS TO CONTACT "GOPHER STATE ONE CALL" FOR UTILITY LOCATIONS <br />(651-454-0002) 48 HOURS PRIOR TO EXCAVATION/CONSTRUCTION. <br />• CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR <br />VARIATIONS FROM THE PLANS. <br />• THE SITE GRADING OPERATIONS, WHEN COMPLETED, SHALL RESULT IN ALL AREAS BEING <br />GRADED TO "PLAN SUBGRADE ELEVATION". THIS "PLAN SUBGRADE ELEVATION" SHALL BE <br />CONSISTENT WITH THE GEOTECHNICAL REPORT FOR BUILDING AND PAVEMENT AREAS. <br />THE "PLAN SUBGRADE ELEVATION" IN THE PARKING LOT AND DRIVEWAY AREAS SHALL <br />BE DETERMINED BY CHECKING THE PAVEMENT SECTION DETAILS AND REFERRING TO <br />PAVING PLAN FOR LOCATIONS AND LIMITS OF VARIOUS PAVEMENT SECTIONS. <br />• ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO COMMENCEMENT OF <br />GRADING OPERATIONS AND BE MAINTAINED UNTIL ALL AREAS ALTERED ON THE SITE <br />HAVE BEEN RESTORED. <br />• ALL CONSTRUCTION ENTRANCES SHALL BE SURFACED WITH CRUSHED ROCK ACROSS FULL <br />WIDTH FROM ENTRANCE POINT TO 50 FEET INTO CONSTRUCTION ZONE. REFER TO DETAIL. <br />• CONTRACTOR SHALL STRIP, STOCKPILE AND RE —SPREAD SUFFICIENT TOPSOIL TO PROVIDE <br />A MINIMUM 4 INCH DEPTH (COMPACTED) TO ALL AREAS DISTURBED, TO BE SODDED OR <br />SEEDED WITHIN TWO WEEKS OF FINAL GRADING. <br />• ALL SLOPES STEEPER THAN 3:1 SHALL HAVE EROSION CONTROL FABRIC INSTALLED ON <br />SLOPE. VERIFY RESTORATION METHOD AND SEED MIXTURE. <br />• ALL FLARED END SECTIONS SHALL HAVE TRASHGUARDS <br />• ALL TOPSOIL/VEGETATION TO BE STOCKPILED AND USED FOR TOPSOIL IN PLANTING <br />AREAS AND NON—STRUCTURAL FILL AREAS <br />• THE CONTRACTOR MUST MAINTAIN THE EROSION CONTROL TO THE SATISFACTION OF THE <br />CITY ENGINEER AND RICE CREEK WATERSHED THROUGHOUT THE ENTIRE BUILDING PROCESS. <br />• ALL EROSION CONTROL SYSTEMS MUST BE MAINTAINED BY THE CONTRACTOR IN AN <br />ACCEPTABLE CONDITION UNTIL TURF IS ESTABLISHED AND/OR STRUCTURAL SURFACES ARE <br />CONSTRUCTED TO PROTECT THE SOIL FROM EROSION. <br />• ALL SITE GRADING AND EXCAVATION SHALL BE COMPACTED AS PER THE GEOTECHNICAL <br />ENGINEER'S REPORT. BUILDING PADS, PARKING LOTS AND DRIVEWAYS TO BE CONSTRUCTED <br />AS PER THE GEOTECHNICAL ENGINEER'S REPORT. <br />• ALL TREES TO BE SAVED SHALL BE FENCED OFF AT THE DRIP LINE PRIOR TO SITE GRADING <br />AND EXCAVATION. <br />• ALL SITE GRADING SHALL FOLLOW THE CITY OF LINO LAKES, ANOKA COUNTY HIGHWAY ENGINEER, <br />AND RICE CREEK WATERSHED PERMIT REQUIREMENTS. <br />• DRIVEWAY ENTRANCE, DITCH GRADING, DRIVEWAY CULVERT EXTENSION AND STORM SEWER PIPE WITH <br />DRAINAGE MANHOLE NEEDS ANOKA COUNTY HIGHWAY PERMIT TO WORK IN THE RIGHT—OF—WAY. <br />UTILITY NOTES <br />• CONTRACTOR IS TO CONTACT "GOPHER STATE ONE CALL" FOR UTILITY LOCATIONS (612-454-0002) <br />48 HOURS PRIOR TO EXCAVATION/CONSTRUCTION. <br />• DRIVEWAY ENTRANCE, DITCH GRADING, DRIVEWAY CULVERT EXTENSION AND STORM SEWER PIPE WITH <br />DRAINAGE MANHOLE NEEDS ANOKA COUNTY HIGHWAY PERMIT TO WORK IN THE RIGHT—OF—WAY. <br />5' LONG NOT TO SCALE <br />----------------- ------------------- 1---------- <br />0.5' CREST - --------ELEVATION 916.00 <br />i GROUND ---ELEVATION 915.50 <br />GROUND <br />GROUND <br />GROUND <br />WOLMANIZED TIMBERS WITH GALVANIZED 12" SPIKES <br />EXTEND TIMBERS 2 FEET INTO EARTH EMBANKMENT HORIZONTALLY AND VERTICALLY <br />BROAD —CREST RECTANGULAR WEIR <br />pppp- <br />.�N <br />Ruin <br />ut rulln trs.uur ' <br />• . <br />PRETREATMENT FOR BIO7RETENTION <br />Rain Gardens • Swales • Filtration Basins • Infiltration Basins <br />Maximize Capacity 9 Extend Effective We <br />• Grate/filter/chamber combination captures sediment and debris <br />• Overflow points prevent inlet debris from causing bypass before <br />bioretention reaches capacity <br />"A Rain Guardian <br />is a must for any <br />rain garden. <br />- Steve M., <br />St, Paul, MN <br />SEEDING MnDOT SPECIFICATIONS: <br />THE SITE SHALL BE RE —VEGETATED WITHIN 48 HOURS OF ROUGH GRADING EXCEPT. <br />THE SITE SHALL BE RE —VEGETATED WITHIN 48 HOURS OF FINAL GRADING EXCEPT ALL AREAS <br />WITHIN 20 FEET OF ALL PROPOSED STRUCTURES AS INDICATED ON THIS SITE PLAN. <br />SEED: CATEGORY & MIXTURE NO. 33-262 DRY SWALE/POND — 44 LBS PER ACRE <br />--r•a — 4� u9 The Rain Guardians provide CATEGORY & MIXTURE NO. 25-131 LOW MAINTENANCE TURF — 220 LBS PER ACRE <br />f shpw Maintenance very effective pretreatment along <br />`t..� with etffclent,simplified mainte- VERIFY WITH LANDSCAPE DESIGNER. <br />a` • Sediment and debris removed from chamber with shovel nonce." <br />• Drop -in filter cleaned with broom or hose Noah Czech, <br />City of St. Cloud, MN DORMANT SEEDING APPLICATION RATE SHALL BE DOUBLED (AFTER SEPTEMBER 15). <br />MULCH: TYPE I, DISC ANCHORED — 2 TONS PER ACRE <br />r„ram <br />(10% OR LESS OF SOIL SURFACE VISIBLE). <br />123 <br />Ears Installation <br />amazing, with)ust o 0.5"rain event each Rain <br />y Guardian captured two 5 goli buckets full of OR ALTERNATE HYDROSEEDING USE RECOMMENDED MULCH AND TONS PER ACRE <br />sediment. Maintenance Is simple and can be <br />• Placement and securing take only minutes accomplished in only minutes.." <br />Brian Sanoski, <br />r } • New construction or retrofits Wright SWCD <br />/ AN a ON SLOPES 3:1 OR GREATER SHALL BE COVERED WITH AN EROSION <br />CONTROL BLANKET WITH ANCHORS EXCEPT IF USING HYDROSEEDING. ALSO EROSION CONTROL <br />BLANKETS WITH ANCHORS ARE REQUIRED ON ALL POND AREAS EXCEPT IF USING HYDROSEEDING. <br />Rain Guardian —Turret <br />Standard exterior dimensions: <br />44" x 49" base, 19.5" total height <br />Turret prices: <br />Pedestrian rated—$1500 <br />Light traffic rated (2456 lb, wheel lood)—$1750 <br />Galvanized steel grate (2-pioce) <br />Anodized aluminum filter <br />frame and fiberglass filter grid <br />Steel reinforced monolithic <br />concrete risor and bass <br />(1,030 lbs.) <br />Manufactured by. ✓t�rCl�i, <br />Tea.'hylpf"). and hanill uv) adrlihonal and I to rhangv baud on ""w"al i ost and ava,hbdny <br />Rain Guardian —Bunker <br />Standard exterior dimensions: <br />501 x 25.5"W x 15.5"H <br />Bunker price: <br />Pedestrian rated-8850 <br />Galvanized steel grate (1-pioce.) <br />Anodized aluminum filter <br />frame and fiberglass filter grid <br />Pro -assembled composite <br />chamber (50lbs.) <br />1318 McKay or. NE, Suite 300 <br />Ham Lake, MN SS304 <br />(763) 434.2030 (M•F 8:00.4:30) <br />FERTILIZER: 23-0-30 NPK — 200 LBS PER ACRE <br />TEMPORARY SEEDING AND MULCHING IS REQUIRED ON EXPOSED SOILS <br />PER THE MPCA NPDES REQUIREMENTS. SEED MIXTURE 100B (FALL COVER) <br />AND 110B (SPRING/SUMMER) MUST BE USED — 200 LBS PER ACRE. <br />TOPSOIL — 6 INCHES OF SALVAGED NATIVE TOPSOIL SHALL BE USED TO THE <br />EXTENT POSSIBLE. MINIMUM TOPSOIL REQUIREMENT OF 4 INCHES ON ALL VEGETATED AREAS. <br />REDUCE WEEDS — MOW 2 TO 3 TIMES (30 DAYS APART) FIRST YEAR, 6-8 INCHES OFF THE <br />GROUND <br />MOW 1 TIME SECOND YEAR <br />STREET SWEEPING — REGULAR, IF NOT DAILY, SWEEPING AND CLEANING OF STREETS WILL BE <br />REQUIRED IF TRACTED UP BY CONSTRUCTION ACTIVITY. <br />7910 LAKE DRIVE, <br />LINO LAKES, MN 5 5 014 <br />C7 <br />Client: MR. PAUL SELBITSCHKA <br />Design by <br />Original date <br />I certify that this plan, specification, or report was prepared by <br />PRECISION TUNE AUTOMOTIVE CENTER <br />JF <br />10-11-2021 <br />me or under my direct supervision and that I am a duly Licensed <br />Professional Engineer under the laws of the state of Minnesota. <br />550 LILAC STREET <br />LINO LAKES, MN 55014 <br />Drawn by <br />Revisions <br />�� <br />Jonathan <br />Date 10-11-20-2021 Minnesota Req. No. 16464 <br />PHONE: 651-784-1100 <br />RP <br />LAKE AND LAND SURVEYING, INC. <br />Survey book No. <br />Page title <br />SURVEYING/CIVIL ENGINEERING <br />+ 815.78 <br />DETAILS <br />1200 CENTRE POINTE, SUITE 375 <br />S.A.P.number <br />Sheet number of <br />ST PAUL, MN. 55120 <br />PHONE (651) 776-6211 <br />E—MAIL' JONFARACI@HOTMAILCOM <br />2021.375 <br />