My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2021-008 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2021
>
2021-008 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2021 7:24:57 PM
Creation date
12/3/2021 9:12:43 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
11/22/2021
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Non-Residential users with irrigation systems that do not have a separate irrigation meter <br /> will be charged at residential rates until such time that a separate irrigation meter is installed <br /> and inspected. <br /> Sewer Utility Rates <br /> Metered Sewer <br /> Base Fee $ 57.09 /Quarter/REU* <br /> Consumption Fee <br /> Over 10,000 Gallons(based <br /> on winter average) $ 1.10 /Thousand Gallons <br /> Flat Sewer $ 67.34 /Quarter/REU* <br /> *REU=a residential equivalent connection: <br /> 1. Residential- a single housing unit <br /> 2. Non-Residential - per Met Council Service Availability Charge Procedures Manual <br /> Storm Water Utility Rates <br /> Quarterly Base Rate <br /> Residential Fee $ 12.00 /Parcel <br /> Non-Residential Fee $ 175.00 /Acre of Impervious ($12.00 <br /> minimum) <br /> Late Penalty 10%of Unpaid Balance,Assessed Quarterly <br /> Water Meter Rental $ 600.00 Deposit <br /> $ 25.00 /Month <br /> Additional Accessories $ 25.00 /Month <br /> Water Usage Fee $ 5.00 /1,000 Gallons <br /> Utility Non-Payment Certification Fee $ 30.00 <br /> Meter Testing(Our Cost,Delivered To Minneapolis) $ 100.00 5/8" -3/4" Meter Test <br /> $ 150.00 1" Meter Test <br /> $ 250.00 1-1/2" -2" Meter Test <br /> Water Use Violation $ 25.00 1st Violation <br /> $ 50.00 2nd and Subsequent Violations <br /> City Trunk Utility Connection Fees - The Trunk Utility Connection Fee consists of two components: a Trunk <br /> Charge and an Availability Charge. <br /> Trunk Charge <br /> The trunk charge shall be paid at the time of subdivision approval or at the time of hook-up, <br /> whichever is first. Residential trunk charges are based on one unit per dwelling unit. <br /> Commercial/Industrial/Institutional(CII)trunk charges are based on a factor of 2.92 units per acre. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.