Laserfiche WebLink
The conditions of the preliminary plat have been substantially fulfilled. Outstanding <br />conditions listed below need to be addressed prior to release of the final plat mylars. <br />Securities will be required with a Development Agreement. <br />RECOMMENDATION <br />Staff recommends approval of the Belland Farms final plat with the following conditions: <br />1. Rosemary Way street right-of-way extends to the west lot line on the preliminary <br />plat in order to provide future transportation and utility connection to the west. <br />a. Any future phase final plat submittal that shows the Rosemary Way street <br />right-of-way shifting north or south shall not be deemed inconsistent with <br />the preliminary plat provided that such location is approved by the City. <br />2. Future platting of Outlot B, Belland Farms shall require construction of street and <br />utilities to the west lot line. <br />3. Future development to the north of Rosemary Way will require sidewalk <br />construction on the north side of the street. <br />4. Applicable Land Use Applications and submittals are required for future <br />development or platting of Lot 2, Block 1 or Outlot B, Belland Farms. <br />5. Separate sign permit applications are required for all permanent monument/pylon <br />and wall signage. <br />6. Separate sign permit applications are required for all temporary signage. <br />7. Outlot A contains a publicly maintained stormwater pond. The outlot shall be <br />deeded to the City after the stormwater pond improvements, vegetation, and <br />landscaping have been installed, established and accepted by the City. <br />8. Future development of Outlot B may require a traffic study to evaluate impacts to <br />24th Avenue, Rosemary Way, CSAH 14/Main Street and Otter Lake Road. <br />9. A Permanent Trail easement and exhibit shall be recorded over the trail on Lot 1, <br />Block 1, Belland Farms. <br />a. The developer is responsible for the installation of the trail. <br />b. The City is responsible for long term maintenance of the trail. <br />c. The City will reimburse the developer the costs of the trail construction. <br />10. The final plat and development agreement shall be recorded prior to any <br />conveyances by Rehbein Properties to a third party. <br />The following items being addressed prior to release of final plat mylars: <br />1. All comments from the City Engineer Memo dated December 1, 2021 shall be <br />addressed. <br />2. All comments from the Environmental Coordinator Memo dated November 9, <br />2021 shall be addressed. <br />3. All comments from the Anoka County Highway Department letter dated <br />September 23, 2021 shall be addressed. <br />4. The applicant shall provide documentation from the owner of the pipeline <br />easement allowing for construction and improvements in easement. <br />5. The applicant shall draft a deed for Outlot A. <br />15 <br />